Whole-Home Remodeling in Houston

Whole-house remodeling in Houston — one living plan, not a stack of weekends.

A whole-home remodel in Houston is a sequencing problem as much as a design problem. We plan living, permitting, and punch list so you are not managing five trades while you still need a working kitchen.

Open living room with linen sofas, plaster walls, and tall windows

What a whole-home remodel can include

A whole-home remodel in Houston is usually the kitchen, the baths, and the floors, light, and hallways that make those rooms feel like one house. It is not a promise to touch every closet. Remodeling Made Easy plans the rooms you will live in on a Tuesday — then sequences the rest so you are not managing five trades while you still need a working sink. If you are remodeling the Houston home you already love rather than staging a listing, start with remodeling the Houston home you love. Finished rooms from real Houston houses sit in the before-and-after gallery — not as invented photos on this page. Irena Hazan is a realtor who founded the company. She is not the interior designer on the job. She works with designers, builders, and trades so layout, mechanicals, and finish stay in one conversation.

The wet rooms often set the calendar. A kitchen remodel and a bathroom remodel done as one plan share dust control, finish language, and the weeks when walls are open. Doing them as two unrelated jobs is how a house ends up with two metals, two floor heights, and two punch lists. When drawings and the crew have to stay married across those rooms, that is design-build remodeling in Houston.

  • Layout and flooring continuity. Opening a kitchen to a den, widening a hall, or running one floor through public rooms changes how the house moves. Transitions, slab height, and which rooms stay closed during install belong in the first walk, not after the first box of plank arrives.
  • Kitchen and baths together. Those rooms hold most of the plumbing, tile, and cabinet decisions. Specifying them as one finish story is how a whole-home feels collected instead of like a catalog of separate weekends.
  • Electrical, plumbing, and HVAC while walls are open. New circuits, a tired air handler, or a plumbing stack you will not want to chase later are easiest when plaster is already coming down. We name what is in and what is a later phase before demolition — not after the drywall is hung.
  • Older Houston-house realities. Many houses here carry aging supply lines, slab or pier-and-beam foundations that have moved, and rooms that run dark and damp in August. On a slab, relocating a bath or an island sink means new cuts you will not want to make twice. On pier-and-beam, we can often reach plumbing from below — and we still have to ask whether the crawl space is dry enough to be the plan. We treat moisture, humidity, and the envelope as part of the remodel conversation. We do not pretend every 1960s galley was waiting for an island.
  • Finish language from foyer to last bath. One metal, one wood tone, one lighting color temperature so the house does not argue with itself. That is easier when the kitchen and baths are specified together. It is harder when you remodel a primary bath this year and the kitchen next year with two different packets.
  • One living plan. Where you cook, bathe, and sleep during the work is a design constraint. If the plan cannot keep those three, it is not a stay-put whole-home — it is a relocation project wearing a bigger name.

A whole-house remodel is not a stack of room remodels

Homeowners searching “whole house remodel Houston” and “whole home remodel Houston” are usually naming the same job. The difference that matters is not the hyphen. It is whether the rooms share one calendar, one finish language, and one living path — or whether you are booking a kitchen this year, a bath next year, and floors whenever the plank is on sale.

A stacked set of room remodels is not a whole-house plan. Each room can look finished. The house still argues with itself: two metals, two floor heights, a hall that was never in anyone’s packet, and a second round of dust after you already lived through the first. Kitchen-plus-baths can be the whole job when the floors, light, and halls already hold. It becomes a whole-house remodel when those connecting rooms have to move with the wet rooms — or when you cannot live through two separate calendars in the same occupied house.

  • One demolition window. Walls that will take new circuits, plumbing, or HVAC should open once. A room-by-room stack opens the same plaster twice and trains the household twice.
  • One living path. A kitchen remodel can keep bedrooms quiet. A whole-house remodel has to say which bath stays, which hall is the zipper, and where groceries land while the old sink is gone. Those are house questions, not room questions.
  • One punch list. Two crews on two contracts leave two leftover lists. Whole-house work is how the door that sticks in the hall and the lamp that is too dim in the kitchen get the same accountable conversation.

If you only need the kitchen, start on kitchen remodeling in Houston. If you only need a bath, start on bathroom remodeling in Houston. If those rooms and the floors between them have to be one house, you are on this page. We will tell you which one you actually have after we walk it. Every project gets its own estimate.

How a live-in whole-home remodel is phased

Staying in the house is a zoning problem. We divide the floor plan into rooms you can still use and rooms that are construction. Dust, access, and a temporary kitchen are decided before the first dumpster, not after. See how we work for the broader sequence.

  1. 01

    Map zones, not moods

    Sleeping rooms, a working bath, and a path to the door stay in the “live” zone as long as we can. Public rooms and the kitchen often go first because they change daily life the most and because their mechanicals sit under the rest of the house.

  2. 02

    Stand up a temporary kitchen

    Fridge, microwave, a place to wash a pan, and coffee in a dining room, laundry, or garage that still has power. If we cannot feed the household for the kitchen window, we say so and talk about a short stay-elsewhere stretch instead of promising both a full demo and Tuesday tacos.

  3. 03

    Which rooms go first

    Envelope and leaks before new plaster. Then the rooms whose plumbing and structure unlock everything else — usually kitchen and at least one bath — while another bath stays open. Secondary baths, closets, and paint come after the household has a place to cook and wash.

  4. 04

    Dust and access control

    Occupied Houston houses need sealed work zones, covered HVAC returns, and a daily path that is not through wet thinset. Kids, pets, and a home office change where the zipper wall goes. We treat that as part of the plan, not a courtesy.

  5. 05

    Punch while you live in it

    The list that matters is the one you make after the first real week: the door that sticks, the lamp that is too dim, the hall that still feels like a job site. Irena Hazan stays the point of contact so you are not translating between trades after the last invoice.

What staying in the house actually requires

The five-step sequence above is the calendar. This is the house while that calendar runs. A live-in whole-house remodel in Houston fails when the plan names rooms and forgets how a household actually cooks, bathes, and sleeps in August humidity with the HVAC still pulling air.

  • Which rooms stay usable. At least two bedrooms with a path that is not through wet thinset. One bath with a real door — not a powder you share with the crew. A place to sit that is not the job site. Closets you still need for school and work. If the only hall is the demolition hall, the “live” zone is a drawing, not a house.
  • A temporary kitchen that feeds people. Fridge, a way to heat food, a basin that drains, and coffee that still works — in a dining room, laundry, or garage that still has power. A microwave on a dresser is a weekend. Whole-house work lasts longer than a weekend. If we cannot stand that kitchen up before the old sink comes out, we say a short stay-elsewhere stretch is the honest plan.
  • Dust and the air the house already uses. Zipper walls are not theater. Occupied Houston houses need sealed work zones, covered HVAC returns, and a path that does not walk gypsum into the bedrooms. The system that cools the house will pull construction dust if returns sit open. We treat that as part of the living plan, not a courtesy after the first white film on a dresser.
  • When to move out briefly, if ever. Move-out is not a personality test. It is a floor-plan test. Overlapping wet rooms that take the only kitchen and the only bath. HVAC replacement that takes the whole house offline in August. A structural opening that is also the only path to sleep. Elevation or floodplain work that is not a cabinet job. We do not invent a typical number of weeks. We name whether the three protected rooms survive — and if they do not, we say so before the dumpster.

Which rooms go first — and which stay the house

The five-step calendar is the order of work. This is the household constraint that calendar has to obey. A live-in whole-home in Houston is not “start in the prettiest room.” It is: keep one working bathroom, feed people, and protect the air the bedrooms still use.

  • Kitchen first is common — not automatic. Public rooms change daily life the most, and their plumbing often sits under the rest of the house. A kitchen that opens to a den is one demolition window. If that opening is also the only path to sleep, the kitchen is not first until we invent a second path. We name that on the walk, not after the dumpster.
  • One working bathroom is a hard rule, not a courtesy. A powder the crew shares is not a household bath. Kids, stairs, and anyone who cannot step over a curb decide which shower you can lose. Hall bath first while the primary still works is a different calendar than a single-bath ranch. Two baths in the same season need a written living plan. If the only bath and the only kitchen come out together, that is a stay-elsewhere stretch wearing a stay-put name.
  • A temporary kitchen is a weekday machine, not a weekend of takeout. Fridge that stays cold, a basin that drains, a way to heat food, and coffee that still works — in a dining room, laundry, or garage that still has power. Whole-home work lasts longer than a long weekend. If we cannot stand that kitchen up before the old sink comes out, we say so and talk about a short stay-elsewhere stretch instead of promising Tuesday eggs.
  • The zipper wall is a living-room decision. It belongs where the household walks, not where a photographer would put it. Covered HVAC returns, a filter plan, and a path that does not walk gypsum into the bedrooms are part of the first drawing. Houston humidity plus open drywall is how a “sealed” zone still films a dresser. We treat the air handler as part of the living plan.

A stay-elsewhere whole-home is a packed-house calendar, not a vacant lot

A live-in whole home remodel Houston households ask about is a zoning problem: rooms you still use versus rooms that are construction. A Houston home renovation that cannot keep a working kitchen, one working bath, and a sleep path is a different job. Move-out is not a personality test. It is a floor-plan test. We name it before the dumpster. We do not invent a typical number of weeks on a website.

  1. 01

    Lock what has to travel with you

    Clothes, school bags, a way to cook, medications, and the documents the city will want. A packed-house calendar still needs a mailbox and a place to receive tile. If you are only leaving for overlapping wet rooms, the rest of the house can stay furniture-in-place behind zipper walls.

  2. 02

    Open once, inspect while it can be seen

    The point of leaving is one demolition window — not a faster mood board. Plumbing, electrical, and mechanicals move while the walls are open. City of Houston review, when the house is in the city, still happens before finish hides the work. Bellaire and West University Place run their own counters. Confirm the office for the address.

  3. 03

    Close the envelope before you sleep there again

    HVAC has to condition the new cubic feet. A leftover duct is not a return plan. Floors that have to land at one height should be in before furniture comes back. Punch is still the list you make after the first real week at 6:30 a.m. — even if you were away for the noisy stretch. Irena Hazan stays the point of contact so you are not translating between trades from a rental.

Company-wide occupancy notes sit on how we work. If the extra room is square footage you do not have yet, compare an addition in the same living plan — not as a second calendar.

Open-wall work in a Houston summer is a climate plan, not a calendar note

The live-in and stay-elsewhere sections above name rooms. This is what those rooms feel like when the walls are open in July, August, or September. Gulf humidity does not pause for demolition. Attic air is a different climate from the hall you still sleep in. A whole-home that treats summer as “the same job in hotter weather” is how new board sweats, returns pull gypsum into bedrooms, and a household that meant to stay starts looking at a short rental. We write the heat into the living plan before the first dumpster. We do not invent a typical number of weeks on a website.

  • The live zone still has to cool. If you are staying, the bedrooms and the working bath cannot share air with the demolition. Covered HVAC returns, a zipper that actually seals, and a filter plan are how the handler keeps serving the rooms you sleep in. Open returns in a Houston August pull construction dust and moisture into the system you still need at 2 a.m. Taking the whole house offline for a change-out in August is a different occupancy call than swapping a filter. Name whether the equipment can keep the live zone honest while the public rooms are open.
  • Open walls drink Gulf air. New gypsum, raw framing, and a stall without a door yet will take on humidity overnight. A rain that hits an opening you meant to close by Friday is a wet assembly, not a scheduling inconvenience. We cover openings, and we do not leave a kitchen wall as a weir because the glass is on a truck. Condensation on board in a closed, unconditioned room is a stop. We are not a mold-remediation company. We will not hang finish on a wet cavity so the calendar looks shorter.
  • Attic work is a heat job before it is a duct job. Many Houston air handlers sit in a hot attic. Opening a kitchen to a den, adding volume, or closing a garage that used to dump heat all change what that unit has to do — and the crew who work that attic in August are in a different climate than the household downstairs. If the existing equipment cannot condition the new cubic feet, a replacement belongs in the first budget, including a path that does not take the live zone offline on the hottest week. A leftover run is not a summer plan.
  • Heat can make stay-elsewhere the honest path. Overlapping wet rooms plus an HVAC change-out, or a structural opening that is also the only sleep path, is already a floor-plan test. Add August humidity and a house that cannot keep one cool, closed bedroom, and camping is not grit — it is a plan that failed. Irena Hazan will say so. She is a realtor who founded the company. She is not the interior designer on the job. She works with designers, builders, and trades so occupancy and the attic stay in one conversation.

Envelope-before-plaster, written for a house you mean to keep, is the planning essay whole-home renovation in Houston. How clay and a slab behave under rooms you open in the same season is general guidance in how Houston clay and slabs affect a remodel — not a report for your lot.

Panel, re-pipe, and ducts while the walls are already open

A whole-home remodel that opens a kitchen and baths is the honest time to ask what the house is made of. Galvanized and cast-iron lines, an undersized or aluminum panel, and attic ducts that cannot take August are whole-house systems. Leaving them for a later weekend is how you open the same plaster twice. We name what has to move with the rooms you came for — and what can wait — before demolition.

  • The panel is a house question, not a kitchen extra. New ranges, hoods, dedicated circuits, bath GFCI, and HVAC that can take August add load. An undersized panel belongs in discovery. We do not invent a typical amperage from a website. If the panel cannot take the rooms, the panel is in this job.
  • Re-pipe is a look, not a default. Opening wet walls in a 1950s–70s Houston house often reveals supply or waste you will not want to leave. Replacing a section in the rooms you came for is not re-piping the whole dwelling. On slab-on-grade, moving water is a cut you make once. On pier-and-beam, a dry crawl can hide new waste — if the crawl is actually the plan. How clay and a slab behave is general guidance in expansive clay and slab-on-grade under a Houston remodel— not a report for your lot. Irena is a realtor who founded the company. She is not an engineer.
  • Ducts and the air handler sit in the same drawing as the layout. Opening a kitchen to a den, adding volume, and closing rooms that used to dump heat into a garage all change what a hot-attic unit has to do. A leftover run is not a whole-home HVAC plan. Capacity belongs in the first budget if the existing equipment cannot condition the new cubic feet.
  • Windows change load and the street. New units in old holes can still be an envelope conversation. A new opening is structure, flashing, and often HOA or city review. Name the openings before anyone prices tile. Drivers for wet rooms that share this calendar live in the kitchen cost guide and the bathroom cost guide.

How City of Houston inspections actually shape the calendar

Inspections are days the house is a job site, not a line on a permit. A whole-home that moves plumbing, electrical, mechanicals, or structure is not a cosmetic weekend. The city needs to see the drain, the bonding, and the vent before board and tile close the cavity. Occupied houses still follow that order. We just keep a daily path that is not through the open wall. We do not invent fees or wait times.

  • Rough-in, inspect, then finish — even if you are sleeping next door. Kitchen and bath stacks share that gate. A pretty ceiling over skipped mechanicals is a future stain. If two wet rooms are in the same season, they should share the inspection window when the walls are already open.
  • Confirm the office for the address. City of Houston review is the path when the house is in the city. Bellaire, West University Place, and other surrounding cities run their own counters. An HOA or deed-restriction packet is a different office from the permit counter. Bring the documents you have. Wet-room City of Houston context lives in kitchen and bath permits in Houston— background, not a substitute for whole-home drawings, and not a fee chart.
  • Structural openings wait on drawings, then on review. A beam where a wall was is not a wider casing. Temporary support, the inspection, and how the household walks around that opening belong in the living plan. Irena does not stamp those drawings. We bring the licensed person the address requires.
  • Floodplain status can rewrite the packet. If the lot is in a mapped floodplain, stacked kitchen, bath, and mechanical work can meet the 50 percent substantial-improvement test — 50 percent of the structure’s market value, not the land. Read Houston floodplain rules for remodels and confirm with the floodplain administrator for the address. That review is a schedule item, not a finish sample.

Company-wide permitting sequence sits on how we work. Homeowner questions that are not this house’s drawings also live on the FAQ.

What moves a whole-home planning range

We do not publish a fake Houston average or a per-square-foot whole-home price. A planning range is a band after a walk, written as what is in, what is out, and which lines are allowances. Every project gets its own estimate. These are the scope levels that change the band — not invented quotes.

  • Finish language on rooms that already work. Floors, paint, lighting, and wet-room refresh on existing stacks is a different job from moving water. The house still needs one metal and one floor height. It does not yet need a trench.
  • Kitchen, baths, and the floors between them — stay-put. That is the common occupied whole-home. Temporary kitchen, one working bath, zipper walls. Drivers for those wet rooms live in the kitchen cost guide and the bathroom cost guide. The questions to settle first are in the Houston kitchen planning guide and in what to settle before a bathroom estimate.
  • Layout, a load-bearing opening, or MEP while walls are open. Opening a galley to a den, relocating a stack on a slab, a panel that cannot take August, or ducts that cannot take the new volume — those forks move the band more than a faucet. Clay and a moving pad belong in the same walk.
  • An addition or conversion in the same living plan. Extra square footage is not a furniture choice. Foundation, roof, HVAC, and parking decide whether that wrap is even honest. Drivers live in the addition cost guide and on garage conversions when the extra room is a bay you already own.
  • Stay-elsewhere versus stay-put. A packed-house calendar can open more at once. It also spends a place to sleep that is not this address. Neither is automatically cheaper. Occupancy is a cost driver because it changes how much of the house is “open” at once.

The other driver pages sit on the Houston remodeling cost hub. How a household matches scope to a real budget — we do not underwrite loans — is on financing notes. Every project gets its own estimate after we walk the house.

Decisions that change the whole-home scope

These forks turn a phased refresh into a longer rebuild. None of them is automatically “worth it.” They should be named before anyone prices hardware. Drivers — not invented averages — live in the Houston remodeling cost guides.

  • Moving walls or plumbing. Opening a kitchen, relocating a bath stack, or putting water in a new island on a slab is a different project than refinishing rooms that already work.
  • Keeping the footprint versus opening the plan. A refresh that keeps the rooms where they are can still be a whole-home if the finish language and the floors have to move together. Opening a galley to the den, stealing a hall for a larger kitchen, or turning two rooms into one is a different job — more demolition, more mechanicals, and a longer occupied window. Name which one you actually want before anyone prices cabinets.
  • Structural changes. A beam where a wall was, a wider opening, or a floor that has to land at one height across rooms changes drawings, inspections, and how long you live in dust.
  • A load-bearing opening is a beam, not a wider casing. The wall between a Houston kitchen and a den is often carrying roof or floor load. Opening it is a drawing, a temporary support plan, and an inspection — not a weekend with a reciprocating saw. If that wall is also the only path to sleep, the living plan changes with the beam. We name the bearing walls on the first walk.
  • Finish level. Stock cabinets and a tight tile spec can serve daily life. Custom millwork, continuous stone, and matching every bath to the primary suite stretch lead times and the occupied window.
  • Whether to include an addition. Extra square footage is a different conversation from rewriting the rooms you already own. If the household still needs parking, a garage conversion or an addition should be compared — not assumed. See home additions when that is on the table.
  • When materials get locked. Appliances before cabinets. Tile and stone before the wet rooms open. Changing a range width after boxes are cut is how a live-in whole-home grows by weeks.
  • How much of the house is “open” at once. Taking every room down to studs can be faster on a vacant house and miserable on an occupied one. A whole-home that keeps two bedrooms and one bath livable is a different scope — and a different calendar — from a full gut.
  • Relocating the kitchen. Keeping the wet wall is a kitchen remodel wearing a whole-house name. Moving the sink, the range, and the hood to a new wall — especially on a slab — pulls plumbing, gas, venting, and the rooms that used to sit next to the old kitchen into the same job.
  • Windows and exterior doors. New openings, bigger units, or a door that used to be a window change the envelope, the HVAC load, and often the permit path. They are not a hardware swap you tack onto a punch list.
  • One floor height through the public rooms. Houston slabs have moved. A “continuous” plank that has to hide a three-quarter-inch step is a different job from a floor that already lands. Transitions, which rooms stay closed during install, and whether you level or live with a threshold belong in the first walk — not after the first box of plank arrives.
  • Phasing over two budgets. Two budgets can be two honest phases — or two finish languages. A written split (kitchen and a bath this year; halls, floors, and the second bath next) only works if mechanicals, metals, and floor height are decided once. A pause with no drawing is how the house gets two calendars.

What a stay-put plan must protect

A stay-put whole-home in Houston has to protect three things at once: a working kitchen, one working bath, and a sleep path that is not through wet thinset. If any of those three fails, the household is camping. We lock those rooms in the living zone before demolition — fridge and a place to wash a pan, a bath that still has a door, bedrooms you can reach without crossing a zipper wall. When the plan cannot keep all three, we say a short stay-elsewhere stretch is kinder instead of promising both a full gut and a normal Tuesday.

Houston realities to confirm for your address

These are patterns, not a permit chart. Confirm them for the address during planning. We do not publish invented code numbers.

  • Clay, slab, and pier-and-beam. How walls, floors, and wet rooms meet Houston clay belongs in the first drawing. On slab-on-grade, moving a bath or an island sink means cuts you will not want to make twice. On pier-and-beam, plumbing may be reachable from below — if the crawl is dry enough to be the plan. A pre-remodel foundation evaluation on Houston clay is how you find out whether this is a shim-the-boxes remodel or a repair-first house. Irena is a realtor who founded the company. She is not an engineer.
  • Humidity and HVAC. New rooms and open walls still have to be conditioned in August. A leftover vent is not comfort. HVAC capacity, returns, and dust protection belong in the living plan, not after drywall.
  • Drainage. Stormwater has to leave the slab. A whole-home that changes grade, a patio, or a roof tie-in without asking where Gulf rain goes is a future leak.
  • City of Houston vs. surrounding cities. Kitchen, bath, and structural work commonly go through City of Houston review when the house is in the city. Bellaire, West University Place, and other surrounding cities have their own processes. Confirm the office that actually reviews the work for your address.
  • Floodplain and substantial improvement. If the house sits in a mapped floodplain, the cost of a whole-home relative to the structure’s value can change what the city requires. Read Houston floodplain rules for remodels. Confirm with the floodplain administrator for your address — Bellaire and West U are separate cities.

Houston house systems that change whole-house scope

Clay, humidity, and which city reviews the address are already in the list above. The systems inside the house are why two Houston whole-house remodels with the same room list are not the same job. We name these on the first walk. We do not invent a typical repair from a website.

  • Pier-and-beam versus slab, as a systems question. Foundation type is already a Houston reality. As a whole-house system it decides whether a kitchen relocation or a new bath stack is reachable from below or is a slab cut you make once. That is a scope fork, not a drawing note.
  • Older galvanized and cast-iron plumbing. Galvanized and cast-iron lines do not become new copper because you painted the hall. A whole-house remodel that opens wet walls is the honest time to ask whether supply and waste in those walls should move with the rooms you came for. Leaving tired lines for “later” is a second demolition.
  • Aluminum or undersized electrical panels. An undersized panel is a whole-house problem, not a kitchen-weekend problem. New ranges, hoods, dedicated appliance circuits, and HVAC that can take August add load. If the panel cannot take the rooms you want, the panel belongs in this conversation — not after the cabinets are ordered.
  • Attic and HVAC sizing. Opening a kitchen to a den, adding volume, and closing rooms that used to dump heat into an unconditioned garage all change what the attic unit has to do. A leftover duct run is not a whole-house HVAC plan. Capacity, returns, and whether the existing equipment can condition the new cubic feet belong with the layout, not after drywall.
  • The floodplain 50 percent test. If the lot is in a mapped floodplain, FEMA’s substantial-improvement rule and City of Houston Chapter 19 can change what the city requires of the entire structure — not only the kitchen. That threshold is 50 percent of the structure’s market value, not the land. Read Houston floodplain rules for remodels and confirm with the floodplain administrator for your address. Bellaire and West University Place are separate cities.

Permits, inspections, and which office actually reviews the house

A whole-house remodel that moves plumbing, electrical, mechanicals, or structure is not a cosmetic weekend. Permitting is part of the job. We do not publish invented fees, wait times, or code numbers. Confirm the office that issues permits for your address before anyone opens a wall.

City of Houston review is the path when the house is in the city. Bellaire, West University Place, and other surrounding cities run their own counters. Kitchen-and-bath permit context for City of Houston wet-room work lives in Do I need a permit to remodel a kitchen or bathroom in Houston? That article is useful background. It is not a substitute for whole-house permitting, and it does not speak for Bellaire or West U. The envelope-before-plaster sequence lives in whole-home renovation in Houston.

Inspections happen while the work can still be seen. A pretty ceiling over skipped mechanicals is a future stain. See how we work for the broader drawings-and-reviews sequence.

1960s–70s Houston houses: wiring, the attic, and the paper trail

A lot of the houses that search “whole house remodel Houston” were built when the city was spreading along new freeways. The rooms you came for — kitchen, baths, a darker den — sit on systems that age as one house. Aluminum branch wiring is a house system, not a dimmer-switch afternoon. We name these on the walk. We do not invent a typical repair from a website.

  • Slab foundations and plumbing under the slab. Slab-on-grade is common. Waste and some supply sit in or under the pour. Moving a toilet, a shower, or an island sink is a cut you make once if you are already opening those rooms. Doing the kitchen this year and “just sliding” a bath next year is how you trench the same bay twice. Pier-and-beam houses have a different access story from below — if the crawl is dry enough to be the plan. Foundation type belongs next to the room list, not as a footnote.
  • Older panels and aluminum wiring. An undersized or tired panel is already a whole-house conversation. Some 1960s–70s Houston houses also have aluminum branch wiring, not only an aluminum feeder. That is a different job from swapping a dimmer. Opening walls for a kitchen and baths is the honest time to ask what has to be replaced, pigtailed, or left alone. An electrician who has seen that era of Houston housing belongs in the first walk, not after the drywall is hung.
  • Attic HVAC and duct replacement. Many Houston air handlers sit in a hot attic. Opening a kitchen to a den, adding volume, and closing rooms that used to dump heat into a garage all change what that unit has to do in August. Leaky or undersized ducts in the attic are not a filter change. If the existing equipment cannot condition the new cubic feet, a replacement — or a dedicated unit — belongs in the first budget. A leftover duct run is not a whole-house HVAC plan.
  • Humidity and moisture as scope, not weather. Gulf air does not pause for demolition. Open walls, a tired vapor story, and returns that sit uncovered are how a live-in whole-home films furniture and swells new wood. Moisture at the slab, in the attic, and at any room that used to be a porch or garage belongs in the same conversation as tile. We treat humidity as part of the assembly, not as a season you wait out.
  • Deed restrictions, HOA, and City of Houston permitting. An HOA or a deed-restriction packet can govern windows, exterior doors, paint, and the street elevation. That is a different office from City of Houston review. Interior wet-room work, electrical, mechanicals, and structural openings commonly go through the city when the house is in the city. Bellaire and West University Place run their own counters. Bring the documents you have. We do not invent what your lot allows. Confirm both the civic office and any association before anyone orders windows.

For wet-room permit context, read Do I need a permit to remodel a kitchen or bathroom in Houston? If the lot is in a mapped floodplain, the whole-home can meet the 50 percent substantial-improvement test — see Houston floodplain rules for remodels.

Test before you open the whole house: lead paint, old ceilings, and floor layers

A kitchen remodel disturbs one room. A whole-house remodel can disturb every painted wall, every ceiling, and every floor layer at once, often while the family is still sleeping down the hall. That is why the year the house was built is one of the first questions we ask. Testing is a step on the calendar before demolition. It is not a cleanup problem after dust has already traveled through the return air.

  • Houses built before 1978 and painted surfaces. Federal EPA lead-safe work rules (the Renovation, Repair and Painting rule) apply to paid renovation in homes built before 1978 when the work disturbs more than about six square feet of painted surface in a room, or more than twenty square feet outside. A whole-home remodel crosses that line almost everywhere. Under the rule, the firm doing the work is EPA-certified, a certified renovator directs lead-safe practices, and the household gets EPA’s “Renovate Right” pamphlet before work begins. If testing shows no lead-based paint in the areas being disturbed, those practices may not be required. Either way, the answer is known before the first wall comes down.
  • Textured ceilings, old floor tile, and the glue under it. EPA lists textured “popcorn” ceilings, older vinyl floor tile and sheet flooring, the adhesive under them, and some older joint compound among the materials that can contain asbestos. Intact material is generally not the hazard. Scraping, sanding, or tearing it out is. Many Houston houses from the 1950s through the 1970s have a ceiling texture and two or three floors stacked under the carpet. Sampling is done by a licensed inspector, and in Texas asbestos inspectors and abatement contractors are licensed by the Department of State Health Services. If something tests positive, removal is planned before general demolition, not discovered during it.
  • Why it changes the live-in plan. In a phased, stay-put whole-home, the rooms you keep living in share air with the rooms being opened. Results decide how a zone is sealed, whether the HVAC for that area is shut down or filtered, and whether a phase that disturbs a positive material is a week the household should spend somewhere else. That is a sequencing decision, not a line item.
  • What it does to the calendar and the range. Testing takes days, not hours, and abatement, if it is needed, happens before the trades who build the new rooms show up. Both are named in the scope instead of hiding inside a contingency. We do not guess results from a photo, and we do not publish a typical abatement price. Every project gets its own estimate.

Older wiring and the attic in 1960s and 1970s houses are covered in the section above. If the house is older than 1978, say so on the consultation form or when you call 713-742-6627, along with whether the ceilings are textured and what is under the carpet, if you know. Guesses are fine.

Three Houston house types that change a whole-home job

The same room list — kitchen, baths, the floors between them — is not the same assembly on every street. A 1950s–60s ranch on a slab, a 1970s–80s two-story in a later subdivision, and an older pier-and-beam house closer in each decide what can stay, what has to move, and whether the family can live through it. We name the type on the first walk. We do not invent a typical Houston house from a search.

Irena Hazan is a realtor who founded the company. She is not the interior designer on the job. She works with designers, builders, and trades so the house you already own — not a catalog plan — stays in one conversation.

The 1950s–60s ranch on a slab

A 1950s ranch on slab is a one-bath calendar wearing a whole-house name. The galley, the hall bath, and the den sit on one pour. There is often no second story to hide in, and there is often no second shower if the only bath comes out. That is the living plan before it is a cabinet conversation.

Plumbing under the slab is why “just sliding the sink” is a different job from refinishing the galley you have. An island drain, a relocated toilet, or a laundry that used to sit on an exterior wall means a cut you will not want to make twice. Keep the wet wall when the work triangle already works. Move water when the household cannot live with the rooms as drawn. Name that before anyone prices an island.

The temporary kitchen on a ranch is usually the dining alcove, a closed garage bay, or a laundry you can spare — not a second kitchen upstairs. Dust protection has to hold a one-story envelope: zipper the public rooms, keep returns covered, and leave a sleep path that does not cross wet thinset. HVAC often lives in a low attic that was sized for closed rooms and a galley. Opening the plan to the den changes the cubic feet that unit has to condition in August. Windows from that era — aluminum sliders, tired weatherstrip — are an envelope decision if you are already rewriting the rooms they sit in.

Flooring continuity on a ranch looks simple because everything is on one level. Houston slabs have moved. A plank that has to hide a heaved bay is a different job from a floor that already lands. Electrical service on these houses was often sized for a range and a window unit, not a hood, induction, and a second refrigerator. The panel belongs next to the room list. We do not invent a typical ranch repair from a website.

The 1970s–80s two-story suburban house

Stairs are a living plan, not a floor-plan decoration. A two-story from this era often already has a hall bath and a primary upstairs, a kitchen and a powder down. That is why some households can keep bedrooms as a camp while the public rooms are open — and why other households cannot, if the only working shower is on the floor you are tearing out.

Opening the downstairs plan — kitchen to family room, removing the half-wall that was carrying something — is a different job from leaving the upstairs baths alone for a later chapter. Two chapters can be honest if they share one finish language and one mechanical plan. They become two metals and two punch lists if the downstairs floor height and the stair landing are not in the same drawing. Name whether this year is the public rooms or the whole stack.

HVAC in these houses is often one attic system doing two floors, or two systems that were never rebalanced after someone opened a wall. Adding volume downstairs without asking what the upstairs rooms will feel like in August is how you buy a pretty kitchen and a hot landing. Ducts in a hot attic, returns that get covered during demo, and a panel sized for a 1970s appliance package are the same walk as the layout. Windows and a front elevation in a later subdivision often sit under an HOA or a deed-restriction packet. That packet is a different office from City of Houston review. Bring it.

Flooring continuity here is a stair problem as much as a slab problem. A plank that dies at the first tread, a landing that is a different height than the family room, and a hall upstairs you are not touching this year all have to be written. A two-story that keeps the upstairs livable still needs a construction path that is not the only stair. Kids, a home office, and anyone who cannot do stairs change which floor you can lose.

Older pier-and-beam in close-in neighborhoods

Close-in pier-and-beam is a crawl-space job before it is a paint job. If the crawl is dry enough to be the plan, supply and waste can often be reached from below — which is why a kitchen relocation or a new bath stack can be a different conversation than the same move on a slab. If the crawl is wet, low, or full of a story you do not want to write twice, it is not a free pass. We look before we promise access.

Floors on these houses are rarely one height. A “continuous” finish through the public rooms is joinery and leveling, not a box of plank. Humidity under the house, insulation that was never the current idea of an envelope, and any porch or sunroom that was pulled into the living plan all change scope. Opening a wall still needs a bearing answer. The difference is what you can reach without a saw-cut in the pour.

Live-in on pier-and-beam still needs one working bath and a kitchen you can cook in. Dust does not only come from the rooms you opened; it also comes from below when the crawl is the work path. Zipper the living rooms the same way you would on a slab. Keep HVAC returns covered. A smaller close-in lot also means setbacks, parking, and a street elevation that neighbors and a civic office will actually see. Windows, a porch rebuild, or a door that used to be a window belong in the same plan as the kitchen if they change the face of the house.

City of Houston review is the path when the house is in the city. Surrounding cities run their own counters. We do not publish neighborhood pages, and we do not invent what your lot allows. Confirm the office for the address. If the lot is in a mapped floodplain, a whole-home that opens walls and mechanicals can meet the 50 percent substantial-improvement test — read Houston floodplain rules for remodels.

How the type changes the next conversation

Tell us which of these you think you have — ranch on slab, later two-story, or pier-and-beam — and which rooms fail you on a school night. The type does not pick the cabinets. It picks whether a temporary kitchen can live in a dining alcove, whether upstairs can stay a camp, and whether moving water is a slab cut or a crawl. Use the consultation form so that conversation starts with your house, or call 713-742-6627.

Who does what on a realtor-led whole-home remodel

People searching “remodel designer” sometimes want one person who will draw the kitchen and also hang the tile. That is not how this company is built. Irena Hazan is a Houston realtor who founded Remodeling Made Easy. She works with designers, builders, and trades. She is not an interior designer. She is not an architect. She coordinates so a whole-home is one conversation from the walk-through to punch — not five inboxes after the dumpster.

  • A remodel designer owns program, layout, and selections. Who cooks, who cannot do stairs, finish that survives Gulf humidity, one metal from foyer to last bath. That person sits in the walk-through with the crew who will open the wall. If you already have a designer you trust, say so. If you do not want to shop a packet to three crews, that is design-build remodeling in Houston.
  • Builders and trades own the opening. Demolition, rough-in, inspections while the work can still be seen, then floors, cabinets, stone, and paint. Plumbing, electrical, mechanicals, and finish have to share a sequence so you still have a working kitchen or one working bath.
  • A licensed design professional is a different chair. Load-bearing openings, a floor that has to land at one height, or a foundation question on Houston clay. Irena does not stamp those drawings. We bring the licensed person the address requires and keep that person in the same conversation as the crew.
  • You still decide the household questions. Which bath you cannot lose. Whether you will live through the work. What stays on the wet wall. A whole-home is not a designer who picks your life. It is a structure so those decisions meet a crew who already heard them.

The next step is the consultation form or a call to 713-742-6627. Company-wide sequence lives on how we work.

Service, HVAC sizing, windows, and the packet that can rewrite the job

The decisions list earlier named moving walls and whether you open the plan. These are the house-system forks that look like extras on a Saturday and then own the calendar. None of them is automatically “worth it.” They should be on the table at the first meeting, not after cabinets are cut. We do not invent a typical amperage, a typical tonnage, or a typical window count from a website. Every project gets its own estimate.

  • A panel swap in the garage is not a service upgrade from the street. New ranges, hoods, bath GFCI, and equipment that can take August add load. Sometimes the existing service can take a new panel in the same footprint. Sometimes the drop from the street, the meter, and what the utility will accept have to move with the rooms. Those are different jobs, different reviews, and a different number of days the house is without power. We look at the panel you have. We name which one you are actually in before anyone prices an induction range. City of Houston electrical review is common when the house is in the city; surrounding cities run their own counters. Confirm the office. Wet-room and electrical context lives in kitchen and bath permits in Houston — background, not a fee chart, and not a substitute for whole-home drawings.
  • Resizing HVAC is a return path, not a bigger box in the same attic. Opening a galley to a den, adding volume, and closing rooms that used to dump heat into a garage all change cubic feet. A leftover supply is not a return. A new air handler that still pulls from a demolition zone will film the furniture you meant to keep. Capacity, a return that actually serves the live zone, and whether a dedicated unit belongs outdoors are first-walk questions. We do not invent a typical size. Comfort in August is a cost driver, not a luxury finish.
  • Windows as a program, not a punch-list box. Replacing the units in the rooms you are already opening is an envelope conversation: flashing, load, and whether the street elevation still reads as one house. Replacing every opening in the dwelling is a different packet — lead times, an HOA or deed-restriction review, and often a second dust season if you tack them on after paint. New openings (a door that used to be a window, a wider unit in an old hole) are structure. Name which program you actually want: the rooms in this job, the street face, or none this year. Bring the documents you have. We do not invent what your lot allows.
  • Substantial improvement is homework for the first meeting, not a finish sample. If the lot is in a mapped floodplain, stacked kitchen, bath, and mechanical work can meet the 50 percent test against the structure’s market value — not the land. That can rewrite drawings, elevation, and what the city will accept of the whole house. Bring what you already have: flood-zone notes from insurance if they exist, an elevation certificate if you have one, and whether you already know the house sits in a mapped floodplain. Do not guess a percentage on a website. Read Houston floodplain rules for remodels and confirm with the floodplain administrator for the address. Bellaire and West University Place are separate cities.

One floor through the house: slab moisture, transitions, and when flooring goes in

In a whole-house remodel the floor is the thing that makes separate rooms read as one house. It is also where a phased, live-in plan most often shows its seams. These are the floor decisions that change scope and sequence, and they are worth settling before the kitchen cabinets are ordered.

  • Test the slab before choosing the floor. Most Houston houses sit on a slab, and a slab under an old carpet or tile can hold more moisture than a new wood or floating floor tolerates. Flooring manufacturers set moisture limits and test methods for concrete, and skipping the test can put the floor warranty at risk. Results can change the product, the underlayment or vapor barrier, or the room it goes in. That test happens after the old floor is up and before the new material is delivered.
  • Flat is a scope line, not a hope. Old tile, glued-down layers, and a slab that has moved on Houston clay leave highs and lows. Long planks and large tile show every one. Grinding high spots and pouring self-leveling compound in low ones is real labor that belongs in the scope, especially where the kitchen and hall meet. If the floor is out of level enough to raise a foundation question, the foundation evaluation on Houston clay comes first.
  • Transitions are where finished heights meet. Tile set on a mortar bed in a bath, a nailed or floating floor in the hall, and carpet in the bedrooms all finish at different heights. Every place two of them meet is either a planned threshold or a trip edge. Deciding the materials room by room early tells us where the transitions fall, whether doors need to be cut down, and whether a stair nosing or a slider track still works.
  • One continuous floor fights a phased plan. If you want the same floor from the entry through the kitchen and living areas, you either install it in one push near the end, after the wet rooms and drywall in those areas are done, or you buy all of it up front so later phases match the same production lot. Patching a continuous floor in a second year rarely matches.
  • Where flooring sits in the sequence. In most whole-home phases flooring goes in after drywall, texture, and the first coat of paint, and before baseboard and the last coat. Cabinets on a slab are usually set on the finished floor or on a level base depending on the floor type and the plan for the next remodel. We write that choice down instead of letting it happen by default.

Phone photos help: the floor at each doorway, under a corner of carpet if you can lift it, and the bottoms of the doors. Send them through the consultation form or call 713-742-6627.

What you should have in hand when the whole house is done

Irena is a Houston realtor who founded the company, so we plan the end of a whole-home remodel the way a buyer’s agent and inspector will read it years later. The last week is not only a punch list. It is the paper trail that lets you maintain the house, file a warranty claim, and answer “was this permitted?” in one email.

  • Permits and final inspections, together. Each permit number with its final sign-off, from the office that actually reviewed the address. A whole-home can carry several permits across trades and phases. A list of them in one place saves a search at closing.
  • Photos of the walls before they closed. Phone photos of open walls and ceilings, taken before insulation and drywall, show where pipes, wires, blocking, and ducts actually run. They are the most useful thing you can own the next time you hang a television, add an outlet, or chase a leak.
  • Equipment, finishes, and warranties. Model and serial numbers for the HVAC, water heater, and appliances, plus manuals and warranty registrations. The paint colors and sheens by room, the floor product and its lot, the tile and grout names, and the cabinet hardware. Matching any of them later without that list is guesswork.
  • Test results and any abatement paperwork. If the house was tested for lead or asbestos before demolition, keep the reports and any clearance paperwork with the permits. They answer a question future buyers and their inspectors may ask about an older house.
  • A short list of what was not in scope. A whole-home rarely touches every system. Writing down what was left as it was, such as the roof, the second-floor baths, or a section of original plumbing, keeps the next decision honest and keeps you from assuming it was done.

If you are weighing a whole-home remodel against selling, the realtor side of that question is in remodeling the Houston home you already love. When you are ready, start with the consultation form or call 713-742-6627. Every project gets its own estimate after we walk the house.

A short whole-home checklist to bring to the first meeting

You do not need a binder. You need enough so we can tell a kitchen-plus-baths job from a whole-home, and whether you can live in the house through it. Bring guesses. We will walk the rooms. Company background — who founded it, and that Irena Hazan is a realtor who works with designers, builders, and trades — lives on about the company and, if that is the question you came with, woman-owned remodeling in Houston. Household questions that are not this house’s drawings also live on the FAQ.

  1. 1. Stay or a short stay-elsewhere stretch? Can you keep a working kitchen, one working bath, and a sleep path that is not through wet thinset — including in August? If any of those three fails, say so now.
  2. 2. Which bath can you not lose? Hall, primary, or the only full bath. A powder the crew shares is not a household shower.
  3. 3. Does the kitchen wet wall stay? Sink, range, and hood on the wall they already have, or a move on a slab. That answer changes the job more than a faucet.
  4. 4. What do you know about the panel and the air? Age if you have it, whether rooms already run hot in August, whether a service upgrade has ever been discussed. Photos of the panel door help. We do not invent amperage from a website.
  5. 5. Windows, HOA, floodplain — if you already know. Bring the deed-restriction or HOA packet if it exists, and any flood-zone note you have. Do not wait for a punch list to ask whether the street face can change.
  6. 6. Phone photos of the rooms that fail you on a school night. Kitchen, both baths if you have two, and the hall that connects them. ZIP. How many people live here. How long you plan to stay in the house.

Typical planning ranges, not a website quote: every project gets its own estimate after we walk the house. The next step is the consultation form or a call to 713-742-6627.

What to have ready before a consultation

Bring the address, how long you plan to stay, and how the house fails you on a school night — not a binder of every room. Phone photos of the kitchen, the baths, and the hall that connects them help. Note whether the house is slab or pier-and-beam if you know, and whether the roof or HVAC is already on your mind. Tell us whether you can live through a temporary kitchen and which bath you cannot lose. We will tell you if this is a whole-home or a kitchen-plus-baths project wearing a bigger name.

Every project gets its own estimate. Drivers — not invented averages — live in the Houston remodeling cost guides. Use the consultation form or call 713-742-6627.

The next step is the consultation form

A whole-home range that belongs to your rooms starts with the address, the rooms that fail you on a Tuesday, and whether you can keep one working bath. We do not invent a typical price on this page. Use the consultation form so the first conversation is about your house — or call 713-742-6627.

Other Houston remodeling services

Most houses are a mix. These pages are the rest of the work we take — kitchens, baths, whole-home, additions, conversions, and design-build — for homeowners who plan to stay.

Whole-home and whole-house questions

What counts as a whole-home remodel in Houston?

Not every wall. It means one finish language and one living plan across the rooms you actually use — often the kitchen, baths, and the floors and light that tie them together — sequenced so you can stay when a phased plan allows.

Can we live in the house during a whole-home remodel?

Often, if we keep a working kitchen and a place to sleep and bathe. Some houses are kinder as a short stay-elsewhere stretch. We say which one you have after we walk the house — not as a slogan.

Is a kitchen-and-baths remodel the same as a whole-home?

Not always. Kitchen plus baths can be the whole job if the floors, halls, and finish language already hold. It becomes whole-home when the rooms that tie them together also need one plan — or when you cannot live through two separate calendars.

How long do households usually stay in a temporary kitchen?

Long enough that it has to work for real cooking, not a weekend of takeout. The window lasts until the new kitchen can take daily meals again. We do not invent a typical number of weeks on a website. If the only kitchen and the only bath come out together, a short stay-elsewhere stretch can be kinder than camping.

When should an addition or garage conversion be in the same whole-home plan?

When the extra room has to share finish, HVAC, and the living plan with the rest of the house — or when parking and the yard decide whether a conversion or an addition is even possible. Doing the kitchen now and the addition later is how you get two floor heights and two punch lists.

Do you invent a typical whole-home price?

No. Cost moves with layout, mechanicals, finish level, and whether you stay in the house. Read the cost guides for drivers, then request a consultation for a range that belongs to your rooms. Every project gets its own estimate.

Is a whole-house remodel different from a whole-home remodel?

Homeowners use both names for the same job: one living plan across the rooms you actually use, not a promise to touch every closet. A stacked set of room remodels is not that plan. If the kitchen, baths, and the floors between them have to share a calendar and a finish language, you are in a whole-house conversation.

When should we move out for a few weeks?

When the plan cannot keep a working kitchen, one working bath, and a sleep path at the same time — or when HVAC replacement, overlapping wet rooms, or a hall that is the only path take the house offline. A short stay-elsewhere stretch is kinder than camping. We say so after we walk the house, not as a slogan.

Do old pipes or an old electrical panel have to be in the same whole-house job?

Often, if walls are already open. Galvanized or cast-iron lines and an aluminum or undersized panel are whole-house systems. Leaving them for a later weekend is how you open the same plaster twice. We name what has to move with the rooms you came for — and what can wait — before demolition.

Can we phase a whole-house remodel across two budgets?

Yes, if the phases share one finish language, one mechanical plan, and a living path. Two budgets can be two honest chapters. They can also be two metals and two floor heights. We write the split on purpose — kitchen and a bath this year, the rest of the public rooms next — instead of pretending a pause is a plan.

Does aluminum wiring in a 1960s–70s Houston house belong in the whole-home job?

If the house has aluminum branch wiring, treat it as a house system, not a dimmer-switch afternoon. Opening walls for a kitchen and baths is the honest time to ask what has to be replaced, pigtailed, or left alone. We do not invent a typical fix from a website. An electrician who has seen that era of Houston housing belongs in the first walk, not after the drywall is hung.

Do deed restrictions or an HOA change a Houston whole-home remodel?

They can, especially for windows, exterior doors, paint, and anything that changes the street elevation. City of Houston permitting and an HOA packet are different offices. Bring the documents you have. We do not invent what your lot allows. Interior wet-room work still has to go through the city that actually reviews the address.

Should window replacement sit in the same whole-home plan?

When the openings, the HVAC load, or the exterior finish have to change with the rooms you came for, yes. New units in old holes can still be a whole-house envelope conversation. Tacking windows onto a punch list is how you get two exterior languages and a second dust season. Name the openings before anyone prices tile.

Does a 1950s Houston ranch change a whole-home more than a later two-story?

It changes the living plan. A ranch on slab is often a one-bath, one-story calendar — the temporary kitchen has to live on the same floor, and moving water is a slab cut. A 1970s–80s two-story can sometimes keep bedrooms as a camp while the public rooms are open. Neither is automatically easier. We name the type on the walk.

Is pier-and-beam easier because you can reach the plumbing?

Only if the crawl is dry enough to be the plan. Access from below can make a kitchen relocation or a new bath stack a different conversation than the same move on a slab. A wet or low crawl is not a free pass. Floors on these houses are also rarely one height, so “continuous” flooring is still a joinery job.

Can we remodel the first floor of a two-story and leave the upstairs for later?

Yes, if the chapters share one finish language, one mechanical plan, and a stair that still works as a living path. Two budgets can be two honest chapters. They become two metals and two floor heights if the downstairs landing and the rooms you are not touching are not in the same drawing.

How is a move-out whole-home sequenced differently from a live-in one?

A stay-elsewhere whole-home is a packed-house calendar, not a vacant lot. The point is one demolition window: open, inspect while the work can be seen, close the envelope before you sleep there again. A live-in plan instead keeps a working kitchen, one bath, and a sleep path. We name which one the floor plan allows after we walk the house. See how we work.

How do City of Houston inspections change a whole-home calendar?

Inspections are days the house is a job site. Plumbing, electrical, and — when framing moves — structural review happen before finish hides the work. Occupied houses still follow that order; we keep a path that is not through the open wall. Confirm the office for the address. Bellaire and West U run their own counters. Wet-room context lives in kitchen and bath permits in Houston.

What moves a whole-home planning range if you do not publish prices?

Scope level: finish language on rooms that already work; kitchen, baths, and connecting floors while you stay; layout or MEP while walls are open; an addition in the same plan; stay-elsewhere versus stay-put. We do not publish a fake average. Every project gets its own estimate. Drivers live in the Houston remodeling cost guides, including kitchen, bathroom, and additions.

Who is the remodel designer if Irena Hazan is a realtor?

A designer she partners with — not Irena. That person owns program, layout, and selections. Irena is a Houston realtor who founded the company. She works with designers, builders, and trades. She is not an interior designer and she does not stamp drawings. When a wall may carry load, we bring the licensed person the address requires. If drawings and the crew have to stay married, that structure is design-build.

Can we live in the house during a Houston summer whole-home remodel?

Sometimes, if the live zone still cools and the zipper actually seals. Open walls in July and August take on Gulf humidity overnight. Covered returns, a filter plan, and openings that close before rain are part of the living plan — not a courtesy. If the equipment has to come offline, or you cannot keep one cool bedroom, a short stay-elsewhere stretch is kinder than camping. We say which one you have after we walk the house.

Is a new electrical panel the same job as a service upgrade?

No. A panel in the garage can sometimes take new load in the same footprint. A service upgrade from the street — meter, drop, what the utility will accept — is a different review and a different stretch without power. We look at the panel you have. We do not invent a typical amperage from a website. Confirm the office for the address.

What should we bring to a first whole-home meeting?

ZIP, how long you plan to stay, which bath you cannot lose, whether the kitchen wet wall stays, and phone photos of the kitchen, baths, and the hall that connects them. Note the panel, August comfort, windows or an HOA packet, and flood-zone notes if you already have them. Guesses are fine. Use the consultation form or call 713-742-6627.

Does a 1970s Houston house need lead or asbestos testing before a whole-home remodel?

Often, yes. Federal EPA lead-safe rules apply to paid renovation in homes built before 1978 when painted surfaces are disturbed, and a whole-home disturbs a lot of them. Textured ceilings, older vinyl floors, and the adhesive under them can contain asbestos. In Texas, asbestos inspectors are licensed by the Department of State Health Services. We ask the year built at the start so sampling happens before demolition. We do not guess results from photos.

Can we run one floor through the whole house if we remodel in phases?

Yes, but plan it. Either install the continuous floor in one push near the end, after the wet rooms and drywall in those areas are finished, or buy all of the material up front so later phases come from the same lot. Test the slab for moisture first, and decide where tile, wood, and carpet meet so transitions and door heights are planned rather than discovered.

What paperwork should we keep after a whole-home remodel?

Every permit number with its final inspection, photos of the open walls before drywall, model numbers and warranties for the HVAC, water heater, and appliances, paint colors and floor and tile products by room, any lead or asbestos test reports, and a short list of what was not in scope. Irena is a Houston realtor who founded the company, so we plan the closeout with a future buyer’s questions in mind.

Let’s talk about your whole-home remodel in Houston.

Share your kitchen, bath, addition, or whole-home idea. We will walk the space with you and outline a clear next step — no sell-the-house pitch.

Request a Remodeling Consultation