RRemodeling Made Easy

The room you live in every day

Kitchen Remodeling in Houston

We remodel Houston kitchens so breakfast, homework, and company can share the same room. Irena’s realtor background and the designers, builders, and trades she works with help you spend on function and finish — not on a stage set you will not enjoy.

Bright remodeled kitchen with a stone island, wood cabinets, and pendant lights

What kitchen remodeling includes

A Houston kitchen remodel is the room you cook in, plus the path groceries take from the garage, plus the wall everyone stands in at 6:30 p.m. Remodeling Made Easy treats those as one job. Irena Hazan is a realtor who founded the company. She is not the interior designer on the project. She works with designers, builders, and trades so cabinets, stone, venting, and the City of Houston paperwork stay in the same conversation.

Work typically covers layout, cabinetry, counters, backsplash, lighting, flooring in the kitchen zone, plumbing at the sink and dishwasher, gas or electrical at the range, and a hood that actually exhausts. It also covers protection of adjacent rooms, a temporary place to make meals if you stay in the house, and inspections when we move utilities or structure. Cosmetic swaps — new doors on boxes that already work, a faucet, paint — are a smaller job. Opening a wall, moving the sink off the wet wall, or adding an island that needs water in the slab is a different project. Finished Houston kitchens from houses we actually remodeled sit in the before-and-after gallery — not as invented photos on this page. For a household-level planning read on layout, venting, and living through the work, see kitchen remodel planning in Houston.

  • Layout and circulation. Many Houston houses are wide and shallow, or deep with a dark middle. An island that looks right in a photo can block the only path to the backyard. We walk how you cook before anyone draws a bigger island.
  • Cabinets and humidity. Gulf Coast moisture swells cheap boxes and fogs finishes that were specified for a dry climate. Door style, box construction, and hardware tolerance matter more here than a catalog “look.”
  • Stone and the wet edge. Slab count, seams, and the sink cut drive the material conversation. The pretty edge profile is late. The sink location and dishwasher clearance are early.
  • Venting that leaves the house. A hood that recirculates over a gas range is not the same as a hood that ducts out. Attic runs, roof caps, and makeup air belong in the first plan, not after the cabinets are built.
  • Power, gas, and water. Moving a range, adding a second oven, or putting a sink in an island on a slab changes rough-in. City of Houston permitting applies when we alter plumbing, gas, electrical, or structure.
  • Light on gray days. Recessed cans alone leave a Houston kitchen flat in January. We plan task light at the counters, something over the table or island, and a little on the walls so the room works at 6 a.m. and 8 p.m.

How a live-in kitchen remodel is sequenced

Most Houston households we talk to want to stay in the house. That is possible when the plan names a temporary kitchen before demolition, not after the sink is in a dumpster. The sequence is about meals, dishes, and a fridge that still runs — not about pretending dust will not exist.

  1. 01

    Walk how you cook now

    Who is in the room at dinner. Where bags land. Whether kids do homework at the island. Whether you still need a table. That walk decides which walls are sacred and which “improvements” would only look good empty.

  2. 02

    Lock appliances before cabinets

    Width, depth, and venting of the range and fridge have to be real before boxes are ordered. Changing a 36-inch range to a 48 after the cabinet shop has cut is how a live-in job grows by weeks.

  3. 03

    Stand up a temporary kitchen

    Fridge, microwave, a place to wash a pan, and a coffee setup in a dining room, laundry, or garage that still has power. We agree where that lives before we shut the old sink off. If the plan cannot feed the household for the construction window, we say so and talk about a short stay-elsewhere stretch instead of promising both.

  4. 04

    Protect, demo, rough-in, inspect

    Adjacent floors and HVAC get covered. Then demolition, then plumbing, electrical, and any beam work. Inspections happen while the room is still open. Occupied houses need real dust control; we do not treat that as optional.

  5. 05

    Set the room, then punch with you in it

    Cabinets, stone, tile, and lighting go in after the rough work passes. The last week is doors, hardware, caulk, and the list you make once you cook the first real meal. Irena Hazan stays the point of contact so you are not translating between a cabinet shop and a plumber.

Week by week in an occupied kitchen

The five steps above are the job in outline. This is the same work written as the weeks a household actually lives through. We do not invent a typical number of weeks on a website. The order is what keeps meals, inspections, and stone from colliding. Drivers — not invented prices — live in the kitchen cost guide. Every project gets its own estimate.

  1. 01

    Temporary kitchen setup

    The old sink does not come out until a fridge, a way to heat food, a wash basin, and coffee are standing in a named room — dining, laundry, or a garage that still has power. Kids’ lunches and a late shift decide whether that setup is enough. If it cannot feed the household, we say a short stay-elsewhere stretch is kinder than camping. This week is also when boxes and the path to the backyard get a home that is not the job site.

  2. 02

    Dust walls and protection

    Zipper walls, taped floors, and HVAC returns that do not pull drywall dust into the bedrooms. Houston humidity means dust that sits. A leftover plastic sheet in a doorway is not a dust plan. Pets, a home office, and a baby’s room change where the barrier goes. The construction path should not be the only hall to sleep.

  3. 03

    Demolition

    Cabinets, counters, and the finishes that hide the wet wall come out after protection is up. Occupied houses get a dumpster path that is not through the living room if we can help it. What the opened wall shows — tired wiring, a drain that was already slow, a header that is not a header — belongs in the same conversation as the drawings, not in a Friday text after stone is on the truck.

  4. 04

    Rough-in: plumbing, electrical, and gas

    Water, drain, and dishwasher lines; range, oven, and hood circuits; gas if the cooktop stays gas. On a slab, a new island drain or a relocated sink is a cut you make once. On pier-and-beam, the crawl has to be dry enough to be the plan. A 1950s–70s Houston kitchen often hides cloth-wrapped or undersized wiring and a panel that cannot take a new range, a hood, and a second refrigerator. That is a scope fork, not a punch-list surprise. See kitchen and bath permits in Houston for why this work is visible to the city before boxes hide it.

  5. 05

    Inspections while the room is open

    The inspector needs to see the drain, the gas, the bonding, the new circuits, and the hood duct before drywall and cabinets close the cavity. Rough-in, inspect, then boxes — not stone first and a story later. Occupied houses still follow that order. We keep a daily path that is not through the open wall. We do not invent wait times. City of Houston when the house is in the city; a different counter in Bellaire, West University Place, or another surrounding city.

  6. 06

    Cabinets

    Boxes go in after the rough work passes. They have to sit level on Houston clay, or the stone will tell on you at the seam. Appliance openings are the ones you locked before the shop cut — not the ones a Friday photo invented. Gulf humidity is already in the box spec: construction and finish that survive August, not a catalog door that swells. This is also when you still have a temporary kitchen. The new room is not a kitchen until water and a cooking surface are back.

  7. 07

    Templating and countertop lead time

    Stone is templated off the cabinets that are actually in the room, not off a drawing that hoped they would land. Seams, the sink cut, and the dishwasher clearance are this conversation. Lead time sits on the critical path. Ordering after the boxes are set is how a live-in kitchen stays a temporary kitchen for extra weeks. We do not invent a fabricator queue on a website. We do say that missing a template window moves meals, not only the calendar.

  8. 08

    Tile

    Backsplash — and any floor in the kitchen zone that was waiting on the boxes — goes in after the counters have a real edge to meet, or in a sequence we name before demo so two trades are not standing in the same corner. Thinset and Houston humidity do not love a rush. The path through the room has to stay a path; this is still an occupied house.

  9. 09

    Appliances

    Range, fridge, dishwasher, and the hood that actually exhausts land in the openings you locked at the start. Built-in refrigeration and a 48-inch range that were not in the shop ticket do not fit a 36-inch hole. Hookups, makeup air, and a first real meal belong here — not a week of looking at empty boxes while the appliances sit in a warehouse.

  10. 10

    Punch list after the first real meal

    The list that matters is the one you make at 6:30 a.m. and 6:30 p.m.: the drawer that catches, the lamp that leaves the sink in shadow, the dishwasher door that hits a stool. Irena Hazan stays the point of contact so you are not translating between a cabinet shop and a plumber after the last invoice. Punch is not a second design phase.

The temporary kitchen has to feed a Houston week

A live-in kitchen remodel is not “we will figure out meals.” It is a second kitchen that has to work on a school night, after a late shift, and on the Saturday the dumpster is blocking the usual grocery path. The old sink does not come out until that second kitchen is standing in a named room. If it cannot feed the household, we say a short stay-elsewhere stretch is the honest plan — not a tougher version of camping.

  • Name the room before demolition, not after the faucet is in a dumpster. Dining room, laundry, or a garage that still has power are the usual hosts. The room needs a fridge that stays cold in Houston heat, a way to heat food, a basin that can wash a pan, and coffee that still works at 6 a.m. A microwave on a folding table in a hall is how people start eating in the car.
  • Coffee, lunches, and a late plate are the test — not a show kitchen. Packing a lunch while dust walls are up is the real job. So is a plate at 9 p.m. that does not require walking through the open wet wall. If kids, a night shift, or a parent who cooks every evening cannot live with the setup, the setup is wrong. We change the living plan. We do not promise both a full demolition and a normal Tuesday.
  • A wash basin is not a dishwasher, and that is the point. You can live without a dishwasher for a stretch. You cannot live without a place to wash a pan and a fridge that is not in a hot garage. If the only sink in the house is the one coming out, and the only bath is in the same dust zone, this is no longer a kitchen-only conversation. Pair it with how a bathroom remodel sequences a working shower.
  • The cooking path cannot be the dumpster path. Occupied houses still take deliveries, trash, and a crew. Groceries still have to land. We plan the dumpster, the protection, and the walking line so the temporary kitchen is not in the only hall to the bedrooms. Houston humidity means dust that sits; zipper walls are part of feeding people, not a courtesy.

We do not invent a typical number of weeks you will live this way. The order is what keeps meals honest: temporary kitchen, then demo, then the new room. Company-wide sequencing lives on how we work. The next step, when you are ready to talk about your rooms, is the consultation form.

Stone is templated off cabinets that already sit

Countertop lead time is not a catalog footnote. In a live-in Houston kitchen it is the stretch where the household still cooks in the dining room because the new room has boxes and no work surface. Templating happens after those boxes are set and shimmed — not off a drawing that hoped they would land. Missing that window is how meals, not only the calendar, move.

  • Houston clay is why a drawing is not a template. Cabinets have to sit level on a slab that may already be a little out of plane. Shims, scribes, and a long run that will take stone are this week’s work. A template taken from paper will not see the high corner the installer just built out of. Level floors and moving clay are their own conversation — read how Houston clay and slabs affect a remodel before anyone orders a long island top.
  • The sink cut, the seams, and the dishwasher clearance are the template. Undermount versus a farm sink, where a seam is allowed on a moving house, and whether a dishwasher door still opens past a panel — those are measured on the boxes that exist. The pretty edge profile is late. Changing the sink after the slab is cut is how a live-in job grows.
  • Lead time sits on the critical path next to inspections. Rough-in, inspect, cabinets, template, then stone. That order is what keeps a fabricator from arriving before the inspector has seen the drain. We do not invent a typical fabricator queue on a website. We do say that ordering after the boxes are set is the honest calendar, and that a missed template date keeps the temporary kitchen in business.
  • You still need a place to set a pan while you wait. The new room is not a kitchen until a work surface and water are back. The temporary kitchen stays standing through templating and install. Taking it down the day the boxes go in is how people start washing dishes in a bathroom sink.

Drivers — not invented stone prices — live in the kitchen cost guide. Every project gets its own estimate. Inspections that have to happen before boxes hide the work are in kitchen and bath permits in Houston.

Gas versus induction is a first-day lock

Fuel is not a finish. It is the range opening, the hood, a gas line or a new circuit, and often makeup air — decided before anyone cuts a box. Switching after the cabinet shop has cut is how a live-in kitchen grows by weeks. Neither gas nor induction is automatically “the Houston choice.” The house, the vent path, the panel, and how you cook decide.

  • Gas needs a line that is actually there, and a hood that can keep up. A range that “just shifts” three feet is a new gas run if the old stub does not reach. A stronger hood that actually exhausts will pull air out of a tight Houston house; makeup air belongs in the spec with the CFM, not after the first inspection. Recirculating over a gas range is not the same job as a duct that leaves through the attic.
  • Induction needs the right circuit and a cookware conversation. Many 1950s–70s Houston kitchens still have a panel sized for a range and a fridge — not a new cooktop circuit, a hood, and a second oven. That is a scope fork on the first walk, not a punch-list surprise. Cookware you already own either works on induction or it does not. We name that before the shop ticket, not in week twelve.
  • Abandoning a gas line is a decision, not a leftover. If the household is leaving gas, the old line still has to be capped in a way the inspector will accept. If the household is staying on gas, the new stub has to be where the range will actually sit. Both belong in the rough-in that happens while the room is open. See kitchen and bath permits in Houston for why the city wants to see that work before cabinets hide it.
  • The shop ticket has to match the cooktop that will arrive. Width, depth, fuel, and whether the hood is in the wall or in a cabinet chase are the opening. A 36-inch gas range is not a 48. A slide-in is not a rangetop on a separate oven. Changing the SKU after the boxes are cut is how stone, hood, and a live-in calendar all move.

Planning ranges for what those forks cost — not invented averages — live in the kitchen cost guide. Every project gets its own estimate. Lock fuel with appliances, then cabinets. The next step is the consultation form or a call to 713-742-6627.

A new drain in a Houston slab is a cut you make once

Most Houston kitchens sit on slab-on-grade. Water and waste in that slab were poured with the house. Keeping the sink on the existing wet wall is a different project from an island drain, a relocated dishwasher, or a sink that “just moves” to the window. Those moves are trenches. They are not a “while we are here” extra. Keep the wet wall when the triangle already cooks. Move water when the people who use the room at 6:30 p.m. cannot — and name the move before anyone prices doors.

  • An island with water is a layout decision and a slab decision. Power-only (outlets, maybe a microwave shelf) is a circuit you still plan before the floor is closed. A sink or a dishwasher in the island is a drain with pitch, a vent, and a cut you will not want to make twice. Seating overhangs come after that, not before.
  • Saw-cutting a slab and tunneling under one are different jobs. Opening the floor from above is how a new island drain is often run. Tunneling is how a plumber sometimes reaches a leak or a line without taking the whole room apart — still messy, still a structural conversation when the slab itself is in question. Neither is a website diagram. A licensed plumber runs the work; when the slab’s behavior is the issue, a licensed structural engineer belongs in the same week. Irena is a realtor who founded the company. She is not an engineer and she does not stamp those drawings.
  • A slab leak found during demo is a stop, not a surprise cabinet note. New boxes and stone on a wet slab are how a “finished” kitchen fails in the next August. Repair, reroute, or a bigger foundation conversation comes before the shop ticket. Clay that shrinks and swells under that slab is why the leak and the level of the floor are related — read how Houston clay and slabs affect a remodel.
  • Pier-and-beam is a different access story, not a free pass. A crawl that is dry enough to be the plan can hide new waste without saw-cutting the kitchen floor. A crawl that is wet, tight, or full of old work is not that plan. We name which foundation you have on the first walk. We do not guess from a ZIP code.

City of Houston review commonly applies when plumbing moves; surrounding cities run their own counters. Confirm the office for the address. Background is in kitchen and bath permits in Houston. Drivers live in the kitchen cost guide. Every project gets its own estimate.

Appliance specs have to be real before anyone cuts a box

Width, depth, fuel, venting, and the utilities each appliance actually needs are the shop ticket. A photo of a range you like is not a spec. Changing a SKU after the cabinet shop has cut is how a live-in kitchen grows by weeks — the opening is wrong, the hood is wrong, and the stone template waits. Lock the models, then the boxes.

  • Fridge depth and a water line are layout, not accessories. Counter-depth versus a deeper box changes how an aisle feels in a wide, shallow Houston kitchen. A fridge that needs water is a line you run while the wall is open, not a Saturday pierce through finished panels. Measure the path from the garage; bags still have to land.
  • Range width is a wall and a hood, not a catalog number. A 36-inch opening does not take a 48. A slide-in does not take a rangetop on a separate wall oven without a different cabinet run. The hood that actually exhausts has to match the cooktop you locked — attic path, roof cap or sidewall, makeup air on a stronger fan. If the attic is a maze of trusses and a furnace, the range choice should change.
  • Wall ovens, steam, and microwave drawers are circuits and cooling gaps. Each of those wants space the shop will not invent later, and often its own circuit on a panel that was sized for a range and a fridge. A 1950s–70s Houston kitchen that is adding three of them is an electrical conversation on day one. We name what the panel can take and what is a bigger job.
  • The dishwasher lives next to the sink you actually keep. If the sink stays on the wet wall, the dishwasher usually does too. If the sink moves to an island, the dishwasher decision moves with it — water, drain, and a door that still opens past a seating overhang. That is why island water is named before anyone draws stools.

Bring model numbers to the walk if you already have them. If you do not, we still lock sizes and utilities before the shop ticket. Drivers — not invented appliance allowances — live in the kitchen cost guide. Every project gets its own estimate. When the specs are real enough to talk, use the consultation form or call 713-742-6627.

What actually comes out on a Houston kitchen demo

Demo is not a dumpster day with a pretty ending. It is how we see the wet wall, the hood chase, and the wiring a 1960s–80s Houston kitchen often hides behind oak boxes. Cabinets, counters, backsplash, and the floor in the kitchen zone come out after protection is up — not before. Occupied houses get a spoil path that is not the only walk to a bedroom. We do not invent what your walls hide. We open them, then we name the job.

  • Boxes and stone first, then the wet wall. Upper and lower cabinets, the counter, and the backsplash leave so a plumber can see the drain and a gas line, and an electrician can see the range circuit. A “soft demo” that leaves the old boxes and only swaps doors is a refresh. It is not this page. If the sink, the range, and the hood stay, say so on the first walk; that is a different amount of opening.
  • The dumpster is a living-room problem that day. Bags, a saw, and a path that should not be the grocery door. Houston humidity means dust that sits. Zipper walls and covered HVAC returns belong on demo morning, not after the first bag of plaster. Pets, a home office, and a baby’s room change where the barrier goes. Paper on the floor is not a dust plan if the old return is still pulling from the open kitchen.
  • What the opened wall is allowed to change. Tired cloth-wrapped wiring, a drain that was already slow, a header that is not a header, a hood that never left the cabinet. Those finds belong in the same conversation as the drawings — not in a Friday text after stone is on the truck. Drivers live in the kitchen cost guide. Every project gets its own estimate.
  • Demo is loud so the trades can see. It is not the whole calendar. Plumbing, gas, electrical, and any beam work come next, while the room is still open. Finish waits. The temporary kitchen has to already be feeding people, or this is not a stay-put job. Sequence across the company lives on how we work.

Bring phone photos of the whole room, the hood, and the path to the backyard. The next step is the consultation form or a call to 713-742-6627.

Kitchen circuits, GFCI, and AFCI are not a punch-list surprise

A Houston kitchen that is getting a new range, a hood that actually exhausts, a dishwasher, and a second refrigerator is an electrical job, not a cabinet job with outlets. Countertop receptacles in a kitchen typically need GFCI protection. Many new or extended kitchen circuits also need AFCI protection. We do not invent code numbers, fees, or a “typical panel upgrade” on this page. We name what the existing panel can take on the first walk, and we keep those circuits visible for inspection before boxes hide them.

  • GFCI is the wet-counter conversation. Outlets at the sink, the island, and along the backsplash are the ones a homeowner touches with wet hands. GFCI is how those receptacles trip instead of becoming a shock path. Relocating an island, adding a second prep sink, or running a new countertop strip is new kitchen electrical — not a Saturday swap of a cracked plate. The inspector wants to see that protection while the wall is still open.
  • AFCI is the circuit that feeds the room. Arc-fault protection is about damaged or aging conductors behind boxes, not about the faucet. A 1950s–70s Houston kitchen often still has a panel sized for a range and a fridge. Adding a hood, wall ovens, induction, and a second refrigerator on that panel is a scope fork. Dedicated circuits for those appliances belong in the shop ticket. Sharing one leftover breaker is how a “finished” kitchen trips at 6:30 p.m.
  • Gas relocation and electrical relocation are siblings, not extras. A range that “just shifts” three feet may need a new gas stub, a new circuit, and a new hood path. Island water is a trench on a slab; island power is a circuit you still plan before the floor is closed. City of Houston review commonly applies when we alter electrical, gas, or plumbing. Surrounding cities run their own counters. Confirm the office for the address — see kitchen and bath permits in Houston.
  • The hood that leaves the house is a circuit and a duct. A stronger fan that actually exhausts needs power, a clean attic or sidewall path, and often makeup air so the house does not pull from the attic. Recirculating over a gas range is not that job. If the attic is a maze of trusses and a furnace, the range choice should change — not the other way around.

Irena Hazan is a realtor who founded the company. She is not the electrician of record. She works with designers, builders, and trades so the panel, the hood, and the boxes stay in one conversation. Drivers live in the kitchen cost guide. Every project gets its own estimate. When you are ready, use the consultation form or call 713-742-6627.

The usual order of trades in a live-in Houston kitchen

Occupied houses still follow an inspection order. The difference is meals, dust, and a path that is not through the open wet wall. We do not invent a typical number of weeks on a website. The sequence is what keeps a plumber, an electrician, a hood run, and a cabinet shop from standing in the same corner. Company-wide living notes sit on how we work.

  1. 01

    Protection, then demolition

    Zipper walls, taped floors, and HVAC returns covered so silica and drywall dust do not ride Gulf humidity into the bedrooms. Then cabinets, counters, and backsplash come out. The temporary kitchen is already feeding people, or this is not a stay-put day.

  2. 02

    Plumbing and gas while the floor can still open

    Sink, dishwasher, and any island drain; gas if the cooktop stays gas. On a Houston slab, a relocated drain is a cut you make once. On pier-and-beam, the crawl has to be dry enough to be the plan. This is also when a slab leak, if it is real, stops the cabinet conversation. Clay under that slab is why the leak and the level of the floor are related — read how Houston clay and slabs affect a remodel.

  3. 03

    Electrical, hood duct, then inspect

    New circuits, GFCI at the counters, AFCI where the job requires it, and the hood path through the attic or a sidewall. Rough plumbing, gas, electrical, and the duct need to be visible. Rough-in, inspect, then boxes — not stone first and a story later. City of Houston when the house is in the city; a different counter in a surrounding city.

  4. 04

    Close, cabinets, stone, tile, appliances

    Drywall and paint in the kitchen zone after inspections pass. Cabinets sit level. Stone is templated off those boxes. Backsplash and any floor transition wait on a real counter edge, or on a sequence we name before demo so two trades are not in the same corner. Range, fridge, dishwasher, and the hood that actually exhausts land in the openings you locked at the start.

Irena Hazan stays the point of contact so you are not translating between a plumber and a cabinet shop. The next step is the consultation form or a call to 713-742-6627.

Kitchen flooring has to meet the next room honestly

A Houston kitchen floor is a wet-zone surface, a height, and a transition into a den or hall that may already be out of plane. Matching a new kitchen floor through the next room is more protection, more material, and a longer occupied stretch. Stopping at a threshold is a different job. Neither is wrong. They should be named before anyone prices a cabinet door, because the floor often has to come out with the boxes.

  • Height is a slab conversation, not a showroom sample. Tile, wood, and a luxury vinyl that can live with Gulf humidity sit at different thicknesses. Cabinets and the dishwasher kick need a finished height that is real. A slab that is already a little out of plane — common on Houston clay — is why we shim boxes and why a long run of stone will tell on a floor that was never leveled. See how Houston clay and slabs affect a remodel when the floor itself is the question. A licensed structural engineer evaluates movement. Irena does not.
  • A transition at the doorway is a decision, not leftover trim. If the den stays the old oak and the kitchen becomes tile, the meeting line has to be a line you will live with at 6 a.m., not a reducer you notice every time bags come in from the garage. Continuous flooring into the next room means that room is in the dust plan. Say which rooms are actually in the kitchen job.
  • Wet-zone material is daily life, not a listing extra. The kitchen floor sees water, sand from the yard after a Gulf rain, and chairs that scrape. A finish that only looks right in a photo will not like Houston humidity or a dripping cooler. We talk about what you will still like on a school night — not a stage set.
  • The floor often has to wait on the boxes, or the boxes wait on the floor. That order is named before demo so a tile setter and a cabinet installer are not claiming the same morning. Occupied houses still need a path that is not the only hall to sleep. Drivers — not invented floor allowances — live in the kitchen cost guide. Every project gets its own estimate.

Bring a photo of the doorway into the next room, not only the island. The next step is the consultation form or a call to 713-742-6627.

Same footprint versus a layout move is two different kitchens

Keeping the sink, the range, and the walls where they are is a finish-and-box job with a live-in sequence. Moving water on a Houston slab, opening a wall, or putting a drain in a new island is a rebuild that happens to end as a kitchen. Both can be the right house. They should not share one vague “kitchen remodel” sentence on a bid. Name the fork before anyone prices doors.

  • Same footprint still has demo, circuits, and a hood that leaves. New boxes, stone, backsplash, and a floor transition can stay in the existing work triangle. The sink and range stay. You still need GFCI at the counters, a hood that actually exhausts if the cooktop needs it, and inspections when electrical or a duct changes. It is not “just cabinets.” It is not a slab trench either.
  • A layout move on slab-on-grade is a cut. Relocating a sink, adding island water, or sliding a dishwasher off the wet wall is plumbing in a floor that was poured with the house. Keep the wet wall when the triangle already cooks. Move water when the people who use the room at 6:30 p.m. cannot — and name it before the shop ticket. Clay under that slab belongs in the same walk.
  • Opening a wall is a load-bearing check, not a mood-board opening. A walk and a look at how the joists and roof land decide whether the wall is carrying anything. “It feels like a partition” is not a plan. When the wall may carry load, a licensed design professional is in the conversation. Irena Hazan is a realtor who founded the company. She does not stamp those drawings. A beam, a floor that has to land at one height, and lighting that still works at 6 a.m. come with the missing plaster.
  • Appliance specs still lock before either path is cut. Width, fuel, and venting of the range and fridge have to be real before boxes are ordered — same-footprint or not. Changing a 36-inch range to a 48 after the shop has cut is how a live-in kitchen grows by weeks on either job. Lead times for boxes, stone, and appliances sit on the critical path. We do not invent a fabricator queue on a website. We do say that missing a template window moves meals.

Drivers live in the kitchen cost guide. Every project gets its own estimate. Sequence lives on how we work. The next step is the consultation form or a call to 713-742-6627.

Cabinet, stone, and appliance lead times sit on the live-in calendar

In an occupied Houston kitchen, lead time is not a catalog footnote. It is the stretch where the household still cooks in the dining room because the new room has an opening and no range. Boxes, stone, and appliances each have a queue. Ordering them in the wrong week is how a temporary kitchen lasts longer than the drawings promised. We do not invent wait times. We do lock specs early enough that those queues can be honest.

  • Appliances first, because the opening is the shop ticket. Range width, fridge depth, dishwasher, and the hood that actually exhausts have to be real before anyone cuts a box. Built-in refrigeration and a 48-inch range that were not on the ticket do not fit a 36-inch hole. If a model is months out, we would rather wait on a selection than build a hole you cannot fill. Bring model numbers to the walk if you already have them.
  • Cabinets are a lead time and a humidity spec. Stock, semi-custom, and custom live in different calendars. Gulf moisture swells cheap boxes and fogs finishes specified for a dry climate. Door style is late. Box construction and whether a fridge panel can be configured are early. Custom is not automatically better for how you live; it is better when an odd Houston wall demands it.
  • Stone is templated off boxes that already sit. A drawing hopes they land level. Houston clay moves a slab a little every year; shims make the doors close and a long run of stone not read the slope. Missing that template window is how meals, not only the calendar, move. Seams, the sink cut, and dishwasher clearance are this conversation — not the pretty edge profile.
  • Backsplash and the floor transition wait on a real edge, or on a named sequence. Two trades in the same corner is how an occupied house loses its only path. Name the order before demo. Then the first real meal is the punch list, not a second design phase.

Drivers — not invented allowances — live in the kitchen cost guide. Every project gets its own estimate. When the specs are real enough to talk, use the consultation form or call 713-742-6627.

What opening an older Houston kitchen can reveal

A lot of the Houston kitchens people want to redo were built in the 1950s through the 1980s. The cabinets are the part you see. The part that changes the scope is behind them and under them, and nobody can promise what it is until the boxes come off the wall. What we can do is name the usual suspects on the first walk, decide ahead of time what happens if one shows up, and keep that decision out of the week the plumber is standing in an empty room.

  • Drain lines under the sink. Many older slab houses still have cast-iron waste lines, and some have sections that are cracked, scaled, or patched. Opening the sink wall is the cheapest moment to look. A short section at the kitchen is not the same job as replacing the house’s drains, and we do not assume one means the other. If a camera look is worth doing before demolition, we say so on the walk.
  • Supply pipes inside the wall. Galvanized steel supply lines narrow on the inside as they age, which shows up as weak flow at the faucet. When the wall is already open, deciding whether to replace the run back to a good connection is a short conversation. When it is closed again, that same decision means cutting new finished drywall.
  • Paint and old floor layers. Federal EPA rules on lead-safe work apply to renovation in homes built before 1978 when painted surfaces are disturbed. Kitchens also tend to collect two or three floors stacked on top of each other, and older sheet vinyl, tile, and mastic can need testing before anyone scrapes them. We ask the year the house was built at the start so testing happens before demolition, not after the dust is in the den.
  • The subfloor at the dishwasher and sink. A slow leak that never showed on the ceiling below can still soften the floor under a dishwasher or rot the deck under a sink base, especially in pier-and-beam houses. That repair is small when the room is open and the new cabinets are not yet set. It is a much larger repair after.
  • Wiring that was extended, not planned. Kitchens get decades of small additions: a microwave on a borrowed circuit, an outlet run from the next room, a splice in the wall with no box. The circuit conversation for the new appliances is covered above. The point here is that what is already in the wall gets looked at too, because the inspector will see it once the drywall is off.
  • Termite and moisture damage at exterior walls. A sink under a window on an outside wall is a common place to find old water or termite damage in the framing. If we find it, it gets repaired and inspected while the wall is open, and the rest of the schedule waits for that, not the other way around.

None of this is a reason to panic about an older house. It is a reason to keep a contingency in the plan and to agree, before demolition, how a discovery gets priced and approved. We tell you what we found, show you, and you decide before work continues. When the open walls start pointing to plumbing or electrical that is really a whole-house issue, that is the moment to read what a whole-home renovation in Houston involves and decide whether to fix it once now. Every project gets its own estimate.

Protecting the new kitchen from its own water

A kitchen has three or four water connections hidden behind expensive finishes: the sink, the dishwasher, the fridge line, and sometimes a pot filler or a bar sink in the island. The most common way a finished kitchen gets damaged is not a storm. It is one of those connections leaking slowly into a cabinet base or under a floor where nobody looks. Planning for that costs little at rough-in and saves the new cabinets.

  • Shutoffs you can actually reach. Every fixture should have its own shutoff valve in a place a person can get a hand to without unloading the whole sink base. Knowing where the main water shutoff for the house is belongs in the handover too.
  • The fridge line and the ice maker. A thin plastic line pinched behind a fridge is a well-known source of slow leaks. A proper line and a recessed valve box in the wall behind the fridge let the fridge slide back flat without crushing anything, and give you a valve to close when the fridge is pulled out for cleaning.
  • The dishwasher drain and the floor under it. The dishwasher drain needs the loop or air gap the inspector expects so dirty sink water cannot run back into it. We also decide whether the new floor runs under the dishwasher. If it stops at the opening, a future replacement can leave the new machine sitting lower than the floor around it.
  • A sink base that can take a drip. A sink base built from material that tolerates moisture, or protected with a liner, holds up far better in a humid Gulf Coast house than bare particleboard under a disposal. This is a cabinet spec decision, so it is made with the cabinet order, not after.
  • Island plumbing on a slab. If the sink or a dishwasher moves to an island, those lines run in the slab where you will not see them again. The pressure test and the inspection happen while the trench is open, before concrete goes back. That order is not optional.
  • Small leak sensors. Inexpensive battery water sensors under the sink, behind the dishwasher, and behind the fridge are an easy add. Some households also want an automatic shutoff valve on the main line. Neither replaces good rough-in, but both turn a slow leak into a phone alert instead of a ruined cabinet.

These details belong on the plan with the appliance list, because the fridge, dishwasher, and island locations decide where water goes. If you are weighing a larger remodel around the kitchen, the thinking in remodeling the Houston home you already love helps decide what to fix now. When you are ready, send photos of the sink base, behind the fridge, and the dishwasher through the consultation form or call 713-742-6627.

Decisions that change the kitchen scope

These are the forks that turn a refresh into a rebuild. None of them is “wrong.” They are just the ones that should be named before anyone prices doors and knobs. We do not invent a typical Houston kitchen price on this page; drivers live in the kitchen cost guide. Every project gets its own estimate.

  • Opening to the dining room or den — and the load-bearing check. That is usually a structural and finish decision, not a trim decision. A beam, a floor that has to land at one height, and a lighting change come with the missing wall. A walk and a look at how the joists and roof land decide whether the wall is carrying anything. “It feels like a partition” is not a plan. When the wall may carry load, a licensed design professional is in the conversation. Irena does not stamp those drawings.
  • Keeping versus moving the sink, the range, or the gas line. Keeping the wet wall is a different job from a new drain or a new gas run. On a slab, those moves are cuts you will not want to make twice. Keep the sink and range where they are when the triangle already cooks. Move them when the people who use the room at 6:30 p.m. cannot — and name the move before anyone prices doors. An island sink is the classic version. A range that “just shifts” three feet is the same kind of fork if it needs a new gas line or a new hood path.
  • Island versus peninsula — and whether the island needs water or only power. An island needs clearances on all sides. A peninsula can keep circulation on a tight Houston lot without inventing a walkway that does not exist. Power-only (outlets, maybe a microwave shelf) is not the same job as a sink or a dishwasher in the island. Water in a slab island is a trench. Power in an island is a circuit you still have to plan before the floor is closed. Name which one you actually want before anyone draws a seating overhang.
  • Venting a range hood outside on a slab home. Slab-on-grade does not trap the duct in the room. It just means the hood cannot go down through the floor. The honest path is usually the attic and a roof cap, or a sidewall the address will accept. Fire-rating at the penetration and makeup air on a stronger hood belong with the CFM, not after the first inspection. If the attic run is a maze of trusses and a furnace, the range choice should change — not the other way around.
  • Stock, semi-custom, or custom boxes. Lead time and how much we can tweak a corner or a fridge panel change with that choice. Custom is not automatically better for how you live; it is better when the room’s odd wall demands it.
  • Roof vent versus recirculating hood. If we cannot get a clean duct run, the range choice should change — not the other way around.
  • Continuous flooring into the next room. Matching a new kitchen floor through a den means more protection, more material, and a longer occupied stretch.
  • Doing the kitchen under a tired roof or HVAC. New plaster and paint under a leaking valley is the expensive order. Envelope questions belong on day one of a stay-put remodel. See roofing in Houston if that is hanging over the room.

Permits and inspections for a Houston kitchen remodel

A permit is how the city sees plumbing, gas, electrical, and structure before cabinets hide them. We do not invent fees, wait times, or code numbers on this page. Every address gets its own path — City of Houston when the house is in the city, and a different counter if you are in Bellaire, West University Place, or another surrounding city. For the homeowner version of that conversation, read kitchen and bath permits in Houston. If the lot is in a mapped floodplain, kitchen cost can meet FEMA’s 50 percent substantial-improvement test — see Houston floodplain rules for remodels and confirm for the address.

  • What usually triggers a permit. Moving a sink or a gas line; new circuits for a range, wall ovens, or a second refrigerator; removing or opening a wall; a new or rerouted range hood duct through a ceiling or roof. Those jobs commonly go through building, plumbing, electrical, and — when the hood or HVAC changes — mechanical review.
  • What is often a cosmetic path. Paint, hardware, and new counters on cabinets that stay where they are, with the sink, the range, and the circuits in the same locations. That is a refresh. It is not a rebuild, and dressing it up as one is how a weak hood and a tired panel get a new door style.
  • Why inspections happen while walls and ceilings are open. The inspector needs to see the drain, the gas, the bonding, the new circuits, and the hood duct before boxes and drywall close the cavity. Rough-in, inspect, then cabinets — not stone first and a story later. Occupied houses still follow that order; we just keep a daily path that is not through the open wall.
  • Confirm the office for the address. Kitchen work inside Houston city limits commonly goes through City of Houston. Surrounding cities run their own counters. We confirm which office actually reviews the work before anyone schedules demolition. See how we work for the broader sequence.

Houston-specific kitchen realities

Gulf humidity, a slab that does not forgive a late island drain, and clay that moves the house a little every year are not extras. They are why a Houston kitchen is an assembly, not a cabinet selection. Irena Hazan is a realtor who founded the company. She is not the interior designer on the job. She works with designers, builders, and trades so the hood, the panel, and the stone stay in one conversation.

  • Humidity, hoods, and make-up air. A stronger hood that actually exhausts will pull air out of a tight Houston house. Make-up air belongs in the spec with the CFM, not as a surprise after the first inspection. Recirculating over a gas range is not the same job as a duct to the outside.
  • Vent the hood out of the house. Attic runs, roof caps, and whether a clean path even exists should be decided before boxes are built. If we cannot get a clean duct, the range choice should change — not the other way around.
  • Slab-on-grade plumbing. Moving a sink or putting a drain in a new island often means cutting the slab. Those cuts are not a “while we are here” extra. Keep the wet wall when the layout already cooks; move water when the people who use the room at 6:30 p.m. cannot.
  • Older panels, 1950s–70s wiring, and dedicated circuits. Many Houston kitchens from those decades still carry cloth-wrapped or undersized conductors and a panel sized for a range and a fridge — not a hood, wall ovens, induction, and a second refrigerator. Each of those wants its own circuit. A full panel or tired wiring is a scope decision on the first walk, not a punch-list surprise after the boxes arrive. We name what has to move with this kitchen and what can wait.
  • Gas versus induction. Gas needs a line and a hood that can keep up. Induction needs the right circuit and a cookware conversation. Neither is automatically “the Houston choice.” The house, the vent path, and how you cook decide.
  • Clay soil, stone, and cabinets that sit level. Long stone runs crack at the seam when the house moves and the cabinets were never shimmed for it. Leveling, joints, and where a seam is allowed belong in the drawing — not after the slab is on the truck. See how Houston clay and slabs affect a remodel — and get a licensed structural engineer’s evaluation when the floor is the question.

When the kitchen is part of a bigger remodel

One kitchen can be the whole job. It becomes a bigger plan when you take the wall to the dining room, pair the kitchen with a bathroom remodel, or sequence it as a whole-home remodel. Doing those as two calendars is how you get two metals, two punch lists, and dust in the room you just finished.

  • Kitchen plus the living or dining wall. Opening that wall is a structural and finish decision. A beam, a floor that has to land at one height, and lighting that still works at 6 a.m. come with the missing plaster. Name it before anyone prices doors.
  • Kitchen plus a bath. Those rooms hold most of the plumbing, tile, and cabinet decisions. Specified together, they share dust control and the weeks when walls are open. Specified a year apart, they argue. Read the kitchen cost guide for drivers — not invented averages — then request a range that belongs to your rooms. Every project gets its own estimate.
  • One conversation, not five trades. Design-build remodeling is how drawings and construction stay married when the kitchen is part of a larger scope. Use the consultation form or call 713-742-6627 if the house needs more than one room in the same plan. See how we work for the sequence we follow.

What this is not

This is not a listing kitchen. We will not spend your money on a stage set you will resent on a school night. Irena Hazan is not hanging your tile as the designer of record. Designers, builders, and trades she works with own their pieces; she keeps one accountable conversation. We will not publish a fake citywide average or a per-square-foot kitchen number that ignores your walls.

Planning reading: kitchen remodel planning in Houston and how we work.

A short checklist before the consultation

You do not need a binder. You need enough so we can tell a refresh from a layout job — and whether you can live in the house through it. Pair this with how you cook on a school night. If a bathroom remodel is in the same season, say so; those rooms share dust, tile, and the weeks walls are open.

  • Stay or step out. Whether you plan to live in the house, and which sink or bath you cannot lose.
  • What stays on the wet wall. Sink, range, and gas — keep or move. On a slab that answer changes the job.
  • The wall you think you want gone. A photo from both sides. We will talk about a load-bearing check, not a mood-board opening.
  • Island: water, power, or neither. Seating overhangs come after that.
  • A hood path. The existing hood or the hole where one should be, plus whether you already know the attic is a maze.
  • Photos of the whole room. Including the path to the backyard, the panel if you can open it, and appliance model numbers if you have them.

Request a kitchen consultation

Bring the address, how you cook, and a few phone photos of the existing room — including the path to the backyard and the wall you think you want gone. We will tell you what is a cabinet refresh and what is a layout job, and whether you can live in the house through it. The next step is the consultation form or a call to 713-742-6627.

Other Houston remodeling services

Most houses are a mix. These pages are the rest of the work we take — kitchens, baths, whole-home, additions, conversions, and design-build — for homeowners who plan to stay.

Kitchen questions Houston homeowners ask

Can we live in the house during a kitchen remodel?

Often, if a temporary kitchen is standing before the old sink comes out — fridge, a way to heat food, a place to wash a pan, and coffee that still works. Occupied Houston jobs need real dust control, not a promise that the den will stay clean. If the only kitchen and the only bath come out together, a short stay-elsewhere stretch can be kinder than camping. We say which path you have after we walk the house. Sequence lives on how we work.

Do we need a permit to replace cabinets and counters?

Not always. New doors, hardware, and a counter on cabinets that stay in place — with the sink, gas, and circuits where they are — is often a cosmetic path. Moving a sink, a gas line, or a range hood duct, adding appliance circuits, or opening a wall commonly goes through City of Houston review when the house is in the city. Surrounding cities have their own offices. We confirm the address. We do not publish invented fees or wait times. Background is in kitchen and bath permits in Houston.

Can we move the sink to an island on a slab foundation?

Yes, and it is a different project than keeping the wet wall. Slab-on-grade means new water and drain lines are cuts you will not want to make twice. The island also needs power, and often a dishwasher decision, before anyone falls in love with a seating overhang. Keep the sink on the existing wall when the room already cooks; move it when the layout fails the people who use it at 6:30 p.m. Clay and slab movement belong in that same walk — see how Houston clay and slabs affect a remodel.

Should we choose appliances before cabinets?

Yes. Width, depth, and venting of the range and fridge have to be real before boxes are ordered. Changing a 36-inch range to a 48 after the cabinet shop has cut is how a live-in kitchen grows by weeks. Gas versus induction belongs in that same lock, because the hood, the circuit, and the makeup air change with the cooktop — not after the boxes arrive. Drivers live in the kitchen cost guide. Every project gets its own estimate.

How do we plan a temporary kitchen?

Name the room before demolition: dining room, laundry, or a garage that still has power. Fridge, microwave, a wash basin, and coffee are the minimum that actually feeds a household. The window lasts until the new kitchen can take daily meals again. We do not invent a typical number of weeks on a website. If we cannot feed you through the work, we say a short stay-elsewhere stretch is the honest plan.

What should we bring to the kitchen consultation?

The address, how you cook on a school night, and phone photos of the whole room — including the path to the backyard, the hood or the hole where a hood should be, the range, and the wall you think you want gone. Note whether the house is slab or pier-and-beam if you know, and whether the roof or HVAC is already on your mind. Appliance model numbers, if you already have them, save a second visit. Use the consultation form or call 713-742-6627.

What happens week by week if we stay in the house?

Temporary kitchen first, then dust walls, then demolition. Rough-in plumbing, electrical, and gas come next, with inspections while the room is still open. Cabinets go in after those pass. Stone is templated off the set boxes — not guessed from a drawing — then tile, appliances, and a punch list you make after the first real meal. We do not invent a typical number of weeks on a website. The order is what keeps a live-in job honest. See how we work for the company-wide sequence.

How do we know if a wall is load-bearing before we take it out?

A walk and a look at how the joists and roof land are the start, not a guess from a photo. Opening a kitchen to a den or dining room can be a beam and a floor that has to land at one height — or it can be a partition that was never carrying anything. We do not treat “it feels non-load-bearing” as a plan. When the wall may carry load, a licensed design professional is in the conversation. Irena does not stamp those drawings.

Can we vent a range hood outside on a Houston slab house?

Often, if there is a clean path through the attic or a sidewall that the address will accept. Slab-on-grade does not mean the hood has to recirculate. It means the duct cannot go down through the floor. Attic runs, roof caps, fire-rating at the penetration, and makeup air on a stronger hood belong in the first plan — not after the cabinets are built. If we cannot get a clean path, the range choice should change.

What should we decide before the kitchen consultation?

Whether you will live in the house, which sink and range locations you cannot lose, whether a wall is coming out, whether an island needs water or only power, and whether a hood can actually leave the house. Photos of the whole room, the panel if you can open it, and any appliance model numbers you already have. Drivers — not invented prices — live in the kitchen cost guide. Every project gets its own estimate.

Can we keep cooking on a camp stove in the garage?

A camp stove is not a temporary kitchen. Occupied Houston jobs need a fridge that stays cold, a way to heat food that is not an open flame next to stored boxes, a place to wash a pan, and coffee that still works at 6 a.m. Name the room — dining, laundry, or a garage that still has power — before the old sink comes out. If that setup cannot feed school nights, a short stay-elsewhere stretch is kinder than camping. We say which path you have after we walk the house.

Why can’t we template the counters from the drawings?

Stone is templated off cabinets that already sit in the room. Houston clay moves a slab a little every year; boxes get shimmed so doors close and a long run of stone does not read the slope. A drawing hopes the boxes land. The template measures where they did. Ordering after that measurement is how a live-in kitchen does not stay a temporary kitchen for extra weeks we could have named. We do not invent a fabricator queue on a website.

What if we change the range after the cabinet shop has cut?

The opening, the hood, the circuit or gas line, and often the makeup air all move with the cooktop. A 36-inch gas range is not a 48-inch range and is not an induction cooktop on a new circuit. Changing after the shop ticket is how a live-in kitchen grows by weeks. Lock width, fuel, and venting before anyone cuts a box. Drivers live in the kitchen cost guide. Every project gets its own estimate.

Should a slab leak be fixed before the kitchen remodel?

Yes, if the leak is real. New cabinets and stone on a wet slab are how a “finished” kitchen fails in the next August. A plumber and, when the slab itself is in question, a licensed structural engineer belong in that conversation before anyone orders boxes. Irena is a realtor who founded the company. She is not an engineer. Read how Houston clay and slabs affect a remodel, then confirm for the house.

Do we need a structural engineer because the kitchen floor is out of level?

Sometimes. A little slope that cabinets can be shimmed for is not the same as a slab that is still moving. Cracks that keep growing, doors that stick in dry months, and a floor you can feel across a room are clues, not a diagnosis. A licensed structural engineer evaluates the house. We do not invent whether yours needs repair. Sequence and what to photograph are in Houston clay, slabs, and remodels.

Do kitchen outlets need GFCI or AFCI in a Houston remodel?

Countertop receptacles in a kitchen typically need GFCI protection — the outlets you touch with wet hands at the sink, the island, and the backsplash. Many new or extended kitchen circuits also need AFCI protection. A range, hood, dishwasher, and second refrigerator each want honest power, often their own circuit. We do not invent code numbers on a website. We name what the panel can take on the first walk and keep that work visible for inspection. City of Houston when the house is in the city; confirm the office. Background is in kitchen and bath permits in Houston.

Should the new kitchen floor continue into the den?

Only if that room is actually in the kitchen job. Continuous flooring means more protection, more material, and a longer occupied stretch. A transition at the doorway is a different job — and a line you will live with every time bags come in from the garage. Height still has to be honest on a Houston slab that may already be a little out of plane. Clay under that slab is why boxes get shimmed; see how Houston clay and slabs affect a remodel.

What is the usual order of trades if we stay in the house?

Protection and a temporary kitchen first, then demolition. Plumbing and gas while the floor can still open. Electrical, the hood duct, and inspections while the room is still open. Then close, cabinets, stone templated off those boxes, tile, appliances, and a punch list after the first real meal. Occupied houses still follow that inspection order. We do not invent a typical number of weeks. Sequence lives on how we work.

Is a same-footprint kitchen faster than moving the sink?

It is a different job, not a promise of speed. Keeping the sink and range where they are still needs demo, honest circuits, and a hood that actually exhausts if the cooktop needs it. Moving water on a Houston slab is a cut you make once. Opening a wall is a load-bearing check. Appliance specs still lock before either path is cut. Drivers — not invented calendars — live in the kitchen cost guide. Every project gets its own estimate.

What if something bad is found behind the old kitchen cabinets?

In older Houston houses that is common enough to plan for: cast-iron drains, galvanized supply lines, a soft subfloor at the dishwasher, or old water or termite damage at an outside wall. We name the likely suspects on the first walk, keep a contingency in the plan, and agree before demolition how a discovery gets priced and approved. If we find something, we show you and you decide before work continues. Every project gets its own estimate.

Does a house built before 1978 change a kitchen remodel?

It can. Federal EPA lead-safe work rules apply to renovation in homes built before 1978 when painted surfaces are disturbed, and older flooring layers and adhesives may need testing before they are removed. That is why we ask the year the house was built at the start, so any testing happens before demolition rather than after dust is in the rest of the house.

How do we keep a new kitchen from water damage?

Plan it at rough-in: reachable shutoff valves at every fixture, a proper fridge water line with a recessed valve box, the dishwasher drain loop or air gap the inspector expects, a sink base that tolerates moisture, and pressure-tested island lines before the slab is closed. Small battery leak sensors under the sink and behind the fridge and dishwasher are an easy add. Send photos through the consultation form or call 713-742-6627.

Let’s talk about your kitchen in Houston.

Share your kitchen, bath, addition, or whole-home idea. We will walk the space with you and outline a clear next step — no sell-the-house pitch.

Request a Remodeling Consultation
Call NowRequest Consult